Lead Project Scheduler: Critical Path & Risk Insights

Massaro Construction Group

Pittsburgh (Allegheny County)

In loco

USD 75.000 - 110.000

Tempo pieno

11 giorni fa

Una candidatura completa in un minuto

Curriculum e lettera di presentazione personalizzati, pronti da inviare.

Supera i filtri ATS

Descrizione del lavoro

Massaro Construction Group is seeking a Project Scheduler to develop and maintain comprehensive master schedules from conception through closeout. The role includes reporting to the VP and coordinating with PMs, superintendents, and subs to ensure milestones are met.

The ideal candidate has 3–5 years in building construction scheduling, strong P6 skills, and experience with CPM, delay analysis, and EOT claims. Valid driver’s license required.

Competenze

  • Degree in Civil Engineering or Construction Management preferred.
  • 3–5 years scheduling experience in building construction.
  • Proficient in Primavera P6 software.
  • Knows baseline, progress, recovered schedules; CPM and percent complete.
  • Ability to make confident, timely and fact-based decisions.
  • Experience performing forensic delay analysis and EOT claims using TIA and window analysis.
  • Valid driver’s license.

Mansioni

  • Develop, maintain and modify project master schedules from conception through closeout.
  • Report weekly to VP Construction Operations to ensure milestones are achieved.
  • Coordinate with project management, superintendents and subcontractors; conduct weekly coordination meetings.
  • Coordinate project controls to assess risk and prepare impact assessments.
  • Analyze schedule changes and their impact on cost and timeline; maintain version control.
  • Ensure change orders and delays are documented and communicated.
  • Lead scheduling meetings and prepare detailed reports for the team.
  • Forecast and manage the project budget with respect to the schedule.
  • Conduct forensic delay analysis using Fragnet, TIA and As-Planned vs As-Built to identify critical path impacts.

Conoscenze

Scheduling experience
P6 proficiency
CPM concepts
Decision making
Delay analysis

Formazione

Civil Eng/CM degree

Strumenti

Primavera P6

Descrizione del lavoro

Massaro Construction Group is seeking a Project Scheduler to develop and maintain comprehensive master schedules from conception through closeout. The role includes reporting to the VP and coordinating with PMs, superintendents, and subs to ensure milestones are met.

The ideal candidate has 3–5 years in building construction scheduling, strong P6 skills, and experience with CPM, delay analysis, and EOT claims. Valid driver’s license required.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Project Scheduler - Construction
Project Scheduler - Construction

Massaro Construction Group • Pittsburgh

In loco
USD 75.000 - 110.000
Construction Project Scheduler: CPM & Forensic Delay
Construction Project Scheduler: CPM & Forensic Delay

Massaro Corporation • Pittsburgh

In loco
USD 90.000 - 120.000
Senior Construction Scheduler - Critical Path & P6 Lead
Senior Construction Scheduler - Critical Path & P6 Lead

McGough • Bismarck (ND)

Ibrido
USD 110.000 - 160.000
Project Scheduler
Project Scheduler

FootBridge • Illinois

In loco
USD 70.000 - 90.000
Construction Project Scheduler – Mission-Critical Projects
Construction Project Scheduler – Mission-Critical Projects

STRM Recruiting • Phoenix (AZ)

In loco
USD 85.000 - 120.000
Senior Construction Scheduler: Master of CPM & Lean Planning
Senior Construction Scheduler: Master of CPM & Lean Planning

McGough Construction • Bismarck (ND)

In loco
USD 90.000 - 150.000
PROJECT SCHEDULER
PROJECT SCHEDULER

CALLAHAN INC • City of White Plains (NY)

In loco
USD 90.000 - 120.000
Senior Construction CPM Scheduler & Analyst
Senior Construction CPM Scheduler & Analyst

MBP • Chesapeake (VA)

In loco
USD 100.000 - 120.000
Employer-paid insurance
401(k) profit-sharing
Tuition assistance
+1
Project Scheduler - Construction
Project Scheduler - Construction

Massaro Corporation • Pittsburgh

In loco
USD 90.000 - 120.000
Project Scheduler
Project Scheduler

Right Hire Consulting LLC • Quincy (MA)

In loco
USD 70.000 - 110.000