Grid Operations Lead – Real-Time Transmission

Salt River Project

Scottsdale (AZ)

Ibrido

USD 140.000 - 190.000

Tempo pieno

19 ore fa
Candidati tra i primi

Una candidatura completa in un minuto

Curriculum e lettera di presentazione personalizzati, pronti da inviare.

Supera i filtri ATS

Vantaggi offerti da questo lavoro

Pension Plan
401(k) with employer matching
Medical, vision, dental, and life保险
Over 200+ hours of PTO
Parental leave and adoption assistance
Wellness programs
Disability plans
Tuition assistance
Employee Resource Groups

Descrizione del lavoro

Salt River Project in Arizona seeks a First line leader for System Operators and Power Dispatchers to oversee real-time operations of SRP's Bulk Electric System. You will lead transmission operations, Balancing Authority activities, and Energy Imbalance Market oversight, ensuring safety, reliability, and efficiency.

The role requires a bachelor's degree (preferred) and 7+ years of experience, with NERC certification within a year.

Competenze

  • Bachelor's degree preferred; relevant field encouraged.
  • Minimum 7 years of relevant experience; 11 years with equivalent mix.
  • NERC Reliability Coordination Certification within 1 year.

Mansioni

  • Provide leadership to ensure safe, reliable operation of SRP transmission and related markets.
  • Oversee control room operations during major events and emergencies.
  • Communicate with reports and other departments to improve tools and reliability.
  • Identify improvements with other Grid Operation Supervisors; ensure regulatory compliance.
  • Support training and development of System Operators/Dispatchers.
  • Develop Operating Practices and represent the department in inter-department meetings.
  • Lead projects, manage EMS development, and ensure readiness of control centers.
  • Schedule staffing and manage overtime; review outages and engineering reports.

Conoscenze

Leadership
Operations management
Cross-functional collaboration
Strategic thinking

Formazione

Bachelor's degree in a relevant field
NERC Reliability Coordination Certification

Descrizione del lavoro

Salt River Project in Arizona seeks a First line leader for System Operators and Power Dispatchers to oversee real-time operations of SRP's Bulk Electric System. You will lead transmission operations, Balancing Authority activities, and Energy Imbalance Market oversight, ensuring safety, reliability, and efficiency.

The role requires a bachelor's degree (preferred) and 7+ years of experience, with NERC certification within a year.

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Grid Operations Leader – Transmission & Dispatch (Hybrid)
Grid Operations Leader – Transmission & Dispatch (Hybrid)

SRP • Scottsdale (AZ)

Ibrido
USD 130.000 - 190.000
Pension Plan
401(k) with employer matching
Health insurance from day one
+6
Grid Operations Manager
Grid Operations Manager

SRP • Scottsdale (AZ)

Ibrido
USD 130.000 - 190.000
Pension Plan
401(k) with employer matching
Health insurance from day one
+6
Grid Operations Manager
Grid Operations Manager

Salt River Project • Scottsdale (AZ)

Ibrido
USD 140.000 - 190.000
Pension Plan
401(k) with employer matching
Medical, vision, dental, and life保险
+6
Real-Time Transmission Grid Engineer II
Real-Time Transmission Grid Engineer II

Arizona Public Service - APS • Phoenix (AZ)

Ibrido
USD 90.000 - 120.000
Hybrid work model
Hybrid role
Grid Operations Trainee: Real-Time Power Balancing
Grid Operations Trainee: Real-Time Power Balancing

Arizona Public Service - APS • Phoenix (AZ)

In loco
USD 60.000 - 80.000
Grid Operations Trainee: Real-Time Power Balancing
Grid Operations Trainee: Real-Time Power Balancing

Arizona Public Service Company • Phoenix (AZ)

In loco
USD 80.000 - 105.000
Grid Reliability Engineer II – Real-Time Transmission
Grid Reliability Engineer II – Real-Time Transmission

Arizona Public Service Company • Phoenix (AZ)

Ibrido
USD 90.000 - 130.000
Senior Real-Time Power Systems Engineer
Senior Real-Time Power Systems Engineer

Leidos • Phoenix (AZ)

In loco
USD 90.000 - 120.000
Real-Time Transmission Grid Operator | 24/7 Control Room
Real-Time Transmission Grid Operator | 24/7 Control Room

Lower Colorado River Authority • Austin (TX)

Ibrido
USD 110.000 - 140.000
Hybrid Senior Transmission Operations Engineer
Hybrid Senior Transmission Operations Engineer

Arizona Public Service Company • Phoenix (AZ)

In loco
USD 110.000 - 150.000