First Shift Parts Puller - Production & Inventory

Interstate Power Systems

Marshfield (WI)

On-site

USD 18,000 - 30,000

Full time

5 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Benefits offered by this job

Competitive compensation
Uniforms Tools program
Health insurance options
Flexible paid time off
401(K) with company match

Job summary

Interstate Assembly System's in Marshfield, WI, is seeking a First Shift Parts Puller to support production and up-fitting efforts. The role focuses on timely, accurate parts picking, packing for production, and inventory control to keep schedules on track.

Candidates should have strong communication, warehouse experience, and the ability to lift up to 75 lbs. This full-time, first-shift position offers standard benefits and a straightforward daily routine.

Qualifications

  • Solid verbal, written, and phone communication skills.
  • Experience with heavy truck or equipment operation.
  • Ability to work independently, prioritize and meet timelines.
  • Familiarity with Heavy Truck parts is a plus.
  • Experience in warehouse environment and forklift usage.
  • Familiarity with RF Scanners is a plus.
  • Basic computer skills and experience with MS Office and Outlook.
  • Ability to lift loads up to 75 lbs safely.

Responsibilities

  • Picking of parts on scheduled work orders and relieving inventory.
  • Answer calls for drop-in parts needed by production and up-fitting not on work orders.
  • Adding parts to work orders and correctly relieving inventory.
  • Inventory control operations including cycle counting and location adjustments.
  • May require measuring and cutting material to length.
  • Maintain a clean and orderly work area and comply with all company policy and safety procedures.

Skills

Communication
Heavy equipment
Independence
Record keeping
Truck parts knowledge
Warehouse & forklift
RF Scanners
MS Office
Lifting 75lbs

Tools

RF Scanners
Forklift
MS Office

Job description

Interstate Assembly System's in Marshfield, WI, is seeking a First Shift Parts Puller to support production and up-fitting efforts. The role focuses on timely, accurate parts picking, packing for production, and inventory control to keep schedules on track.

Candidates should have strong communication, warehouse experience, and the ability to lift up to 75 lbs. This full-time, first-shift position offers standard benefits and a straightforward daily routine.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

First Shift Parts Puller - Inventory & Forklift Pro
First Shift Parts Puller - Inventory & Forklift Pro

Interstate Companies, Inc. • Marshfield (WI)

On-site
USD 21,000 - 26,000
Competitive compensation
Uniforms
Tools program
+3
Parts Puller - Production
Parts Puller - Production

Interstate Companies, Inc. • Marshfield (WI)

On-site
USD 21,000 - 26,000
Competitive compensation
Uniforms
Tools program
+3
Parts Puller Production
Parts Puller Production

Interstate Power Systems • Marshfield (WI)

On-site
USD 18,000 - 30,000
Competitive compensation
Uniforms Tools program
Health insurance options
+2
Evening Heavy-Duty Truck Assembler & Up-Fitter
Evening Heavy-Duty Truck Assembler & Up-Fitter

Interstate Power Systems • Marshfield (WI)

On-site
USD 42,000 - 62,000
Parts Puller - Fast-Paced Manufacturing with Benefits
Parts Puller - Fast-Paced Manufacturing with Benefits

Lippert • Elkhart (IN)

On-site
USD 19,000 - 29,000
Comprehensive benefits (medical,Dental
Vision, 401k with employer match
Vacation and holidays
+2
Precision Assembler - Fast-Paced 1st Shift Warehouse
Precision Assembler - Fast-Paced 1st Shift Warehouse

QPS Employment Group • Town of Plover (WI)

On-site
USD 19,000 - 27,000
First-Shift Material Handler: Parts Flow & Stockroom
First-Shift Material Handler: Parts Flow & Stockroom

LDV, Inc. • Burlington (WI)

On-site
USD 19,000 - 29,000
Material Handler - 1st Shift: Forklift & Production Support
Material Handler - 1st Shift: Forklift & Production Support

Generac • Town of Eagle (WI)

On-site
USD 22,000 - 32,000
1st Shift: Light Assembly & Dock Operations
1st Shift: Light Assembly & Dock Operations

Pivot Point, Inc. • Town of Hustisford (WI)

On-site
USD 26,000 - 29,000
Health insurance
Dental insurance
Life insurance
+2
Day Shift Forklift & Inventory Parts Picker
Day Shift Forklift & Inventory Parts Picker

Trillium Staffing • Green Bay (WI)

On-site
USD 28,000 - 32,000