EV Battery Manufacturing Engineer Intern (Co-op)

LG Energy Solution Michigan, Inc.

Lansing, Northern (MI, KY)

Hybrid

USD 28,000 - 34,000

Full time

14 days+
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

LG Energy Solution Michigan, Inc. is seeking a Manufacturing Engineering Intern/Co-op in Lansing, MI.

You will assist engineers in the battery manufacturing environment, learning general production processes, materials, and tooling applications while supporting process development and improvement initiatives. You will collaborate with engineers and operators on projects to troubleshoot equipment, evaluate procedures, and implement standardized workflows that enhance quality and efficiency on the

Qualifications

  • Pursuing a Bachelor’s Degree in Mechanical, Electrical, or Chemical Engineering — Junior or Senior standing.
  • Minimum GPA requirement of 3.0 or higher.
  • Ability to be flexible and adapt to new tasks and projects.
  • Strong problem-solving, critical thinking and analytical skills.
  • Demonstrated teamwork and effectiveness in accomplishing goals.
  • Korean-English bilingual strongly preferred.
  • Must be able to commute to Lansing, MI facility with a valid driver’s license.

Responsibilities

  • Work with engineers and operators to troubleshoot machines on the production floor to ensure highest yield and optimal equipment efficiency.
  • Interface with plant and office team members, as well as external suppliers and contractors.
  • Evaluate existing procedures and production methods for opportunities to improve quality and efficiency.
  • Improve production processes by creating SOPs and ensuring correct floor implementation.
  • Develop procedures, forms, checklists, and schedules to support process development and improvement.
  • Research new technologies, equipment, and supplies to help improve operations.

Skills

Teamwork
Problem-solving
Analytical skills

Education

Bachelor’s degree in Mechanical, Electrical, or Chemical Engineering

Job description

LG Energy Solution Michigan, Inc. is seeking a Manufacturing Engineering Intern/Co-op in Lansing, MI.

You will assist engineers in the battery manufacturing environment, learning general production processes, materials, and tooling applications while supporting process development and improvement initiatives. You will collaborate with engineers and operators on projects to troubleshoot equipment, evaluate procedures, and implement standardized workflows that enhance quality and efficiency on the

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Manufacturing Engineering Intern/Co-op
Manufacturing Engineering Intern/Co-op

LG Energy Solution Michigan, Inc. • Lansing (MI), Northern (KY)

On-site
USD 28,000 - 34,000
Process Engineer - Battery Manufacturing & Optimization
Process Engineer - Battery Manufacturing & Optimization

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 65,000 - 85,000
100% employer paid Medical, Dental, and Vision
Disability and life insurance
Generous Paid Time Off / Holidays
+1
EV Battery Production Lead: Safe, Quality, Growth
EV Battery Production Lead: Safe, Quality, Growth

LG Energy Solution Michigan, Inc. • Holland (MI)

On-site
USD 65,000 - 90,000
EV Battery Quality Inspector – Growth & Benefits
EV Battery Quality Inspector – Growth & Benefits

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 30,000 - 45,000
100% employer paid Medical, Dental, and Vision premium
100% employer-paid disability and life insurance
Employer supported childcare/babysitting programs
+1
Process Engineer I: Prismatic EV Battery Production
Process Engineer I: Prismatic EV Battery Production

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 70,000 - 90,000
Process Engineer I: Battery Production & Yield
Process Engineer I: Battery Production & Yield

LG Energy Solution Michigan, Inc. • Matteson (IL)

On-site
USD 70,000 - 90,000
EV Battery Module Assembler – 2nd/3rd Shift
EV Battery Module Assembler – 2nd/3rd Shift

LG Energy Solution Michigan, Inc. • Holland (MI), Northern (KY)

Hybrid
USD 21,000 - 30,000
Production Supervisor – Battery Manufacturing (12h Rot)
Production Supervisor – Battery Manufacturing (12h Rot)

LG Energy Solution • Phoenix (AZ)

On-site
USD 65,000 - 95,000
Medical coverage
401(k) match
Paid time off
EV Battery Module Assembler - 2nd/3rd Shift
EV Battery Module Assembler - 2nd/3rd Shift

LG Energy Solution • Holland (MI)

On-site
USD 21,000 - 30,000
Engineer, Process
Engineer, Process

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 65,000 - 85,000
100% employer paid Medical, Dental, and Vision
Disability and life insurance
Generous Paid Time Off / Holidays
+1