EV Battery Production Planner

LG Energy Solution Michigan, Inc.

Lansing (MI)

On-site

USD 60,000 - 85,000

Full time

22 hours ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

LG Energy Solution Michigan, Inc. is seeking a Specialist I, Planning in Lansing, MI. You will plan and execute efficient production flow, design models to optimize labor costs and production efficiency, and coordinate PLA activity across LG locations.

The role emphasizes collaboration with production teams and department managers to achieve results. Responsibilities include auditing, cost tracking, reporting, and developing automated workflows with RPA while maintaining 5S3R standards and

Qualifications

  • Bachelor’s degree in supply chain management, IT project management, engineering, or related field required; MBA or MS preferred; or equivalent, relevant experience.

Responsibilities

  • Provide production results for timely updates and monitoring.
  • Record operational costs and provide reports.
  • Support plans to efficiently use plant staff and equipment to produce maximum revenue.
  • Support staffing requirements based on upcoming work and historical data on productivity.
  • Support current operational strategies and recommend improvements.
  • Oversee layered process audit (LPA) programs for multiple LG locations.
  • Schedule audit.
  • Author audit documents.
  • Manage users, update profiles.
  • Update schedules for missed audits.
  • Maintain location tables.
  • Maintain software and complete database entries, generating monthly and weekly reports.
  • Develop process-flow diagrams and training materials for team.
  • Develop automated workflows for robotic process automation (RPA).
  • Participate in daily team meeting and project meetings as needed.
  • Develop software solutions for project or inventory management upon request.
  • Collaborate with stakeholders throughout a project to ensure business needs are met.
  • Maintain cleanliness at work-site in accordance with 5S3R Standards: Sort, Set in order, Shine, Standardize, Sustain; Right Location, Right Quantity, Right Container.
  • Perform other duties as assigned.

Education

Bachelor’s degree in supply chain management, IT project management, engineering, or related field

Job description

LG Energy Solution Michigan, Inc. is seeking a Specialist I, Planning in Lansing, MI. You will plan and execute efficient production flow, design models to optimize labor costs and production efficiency, and coordinate PLA activity across LG locations.

The role emphasizes collaboration with production teams and department managers to achieve results. Responsibilities include auditing, cost tracking, reporting, and developing automated workflows with RPA while maintaining 5S3R standards and

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Specialist I, Planning
Specialist I, Planning

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 60,000 - 85,000
EV Battery Production Lead & Technical Operator
EV Battery Production Lead & Technical Operator

LG Energy Solution Michigan, Inc. • Lansing (MI)

Hybrid
USD 60,000 - 76,000
Medical coverage
Disability & life
Childcare support
+2
Process Engineer - Battery Manufacturing & Optimization
Process Engineer - Battery Manufacturing & Optimization

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 65,000 - 85,000
100% employer paid Medical, Dental, and Vision
Disability and life insurance
Generous Paid Time Off / Holidays
+1
EV Battery Manufacturing Engineer Intern (Co-op)
EV Battery Manufacturing Engineer Intern (Co-op)

LG Energy Solution Michigan, Inc. • Lansing (MI), Northern (KY)

Hybrid
USD 28,000 - 34,000
Process Engineer I - Battery Manufacturing & Quality
Process Engineer I - Battery Manufacturing & Quality

LG Energy Solution Michigan, Inc. • Matteson (IL)

On-site
USD 65,000 - 97,000
Process Engineer I: Battery Production & Yield Optimizer
Process Engineer I: Battery Production & Yield Optimizer

LG Energy Solution • Matteson (IL)

On-site
USD 65,000 - 90,000
EV Battery Program Manager - Cross-Functional Leader
EV Battery Program Manager - Cross-Functional Leader

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 80,000 - 100,000
Production Planner: Cost & Scheduling Coordinator
Production Planner: Cost & Scheduling Coordinator

Lg Energy Solution, Ltd. • Holland (MI)

On-site
USD 52,000 - 68,000
100% employer-paid medical, dental, &
401(k) with company match
Paid time off
Contract Battery Production Operator
Contract Battery Production Operator

LG Energy Solution Michigan, Inc. • Lansing (MI)

Hybrid
USD 22,000 - 36,000
EV Battery Maintenance Technician
EV Battery Maintenance Technician

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 52,000 - 76,000
100% employer paid Medical, Dental, &
100% employer-paid disability and life
Generous Paid Time Off / Holidays
+1