EV Battery Production Planner

LG Energy Solution Michigan, Inc.

Lansing (MI)

On-site

USD 60,000 - 85,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

LG Energy Solution Michigan, Inc. is seeking a Specialist I, Planning in Lansing, MI. You will plan and execute efficient production flow, design models to optimize labor costs and production efficiency, and coordinate PLA activity across LG locations.

The role emphasizes collaboration with production teams and department managers to achieve results. Responsibilities include auditing, cost tracking, reporting, and developing automated workflows with RPA while maintaining 5S3R standards and

Qualifications

  • Bachelor’s degree in supply chain management, IT project management, engineering, or related field required; MBA or MS preferred; or equivalent, relevant experience.

Responsibilities

  • Provide production results for timely updates and monitoring.
  • Record operational costs and provide reports.
  • Support plans to efficiently use plant staff and equipment to produce maximum revenue.
  • Support staffing requirements based on upcoming work and historical data on productivity.
  • Support current operational strategies and recommend improvements.
  • Oversee layered process audit (LPA) programs for multiple LG locations.
  • Schedule audit.
  • Author audit documents.
  • Manage users, update profiles.
  • Update schedules for missed audits.
  • Maintain location tables.
  • Maintain software and complete database entries, generating monthly and weekly reports.
  • Develop process-flow diagrams and training materials for team.
  • Develop automated workflows for robotic process automation (RPA).
  • Participate in daily team meeting and project meetings as needed.
  • Develop software solutions for project or inventory management upon request.
  • Collaborate with stakeholders throughout a project to ensure business needs are met.
  • Maintain cleanliness at work-site in accordance with 5S3R Standards: Sort, Set in order, Shine, Standardize, Sustain; Right Location, Right Quantity, Right Container.
  • Perform other duties as assigned.

Education

Bachelor’s degree in supply chain management, IT project management, engineering, or related field

Job description

LG Energy Solution Michigan, Inc. is seeking a Specialist I, Planning in Lansing, MI. You will plan and execute efficient production flow, design models to optimize labor costs and production efficiency, and coordinate PLA activity across LG locations.

The role emphasizes collaboration with production teams and department managers to achieve results. Responsibilities include auditing, cost tracking, reporting, and developing automated workflows with RPA while maintaining 5S3R standards and

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Specialist I, Planning
Specialist I, Planning

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 60,000 - 85,000
EV Battery Production Lead Technician
EV Battery Production Lead Technician

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 55,000 - 75,000
100% employer-paid medical, dental & 视
Production Manager: EV Battery Operations & Safety
Production Manager: EV Battery Operations & Safety

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 90,000 - 130,000
Process Engineer I - EV Battery Production
Process Engineer I - EV Battery Production

LG Energy Solution Michigan • Matteson (IL)

On-site
USD 65,000 - 97,000
Inventory & Production Planner I
Inventory & Production Planner I

LG Energy Solution Michigan • Lansing (MI)

On-site
USD 30,000 - 41,000
On-Site Process Engineer I – Battery Production
On-Site Process Engineer I – Battery Production

LG Energy Solution Michigan • Phoenix (AZ)

On-site
USD 70,000 - 90,000
100% employer-paid medical, dental, &
Paid time off
401(k) with company match
EV Battery Manufacturing Engineering Intern (Jan Start)
EV Battery Manufacturing Engineering Intern (Jan Start)

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 22,000 - 30,000
Senior Equipment Engineer, Battery Manufacturing (On-site)
Senior Equipment Engineer, Battery Manufacturing (On-site)

LG Energy Solution Michigan, Inc. • Holland (MI)

On-site
USD 90,000 - 140,000
Employer-paid health coverage
401(k) match
Paid time off
Manager, Production - Formation
Manager, Production - Formation

LG Energy Solution Michigan, Inc. • Lansing (MI)

On-site
USD 90,000 - 130,000
EV Battery Quality Manager: Lead APQP & Lean
EV Battery Quality Manager: Lead APQP & Lean

LG Energy Solution Michigan, Inc. • Holland (MI)

Hybrid
USD 100,000 - 150,000