ERP Scheduler & Planner — Dynamics AX, Manufacturing

Paslin

Pontiac (MI)

On-site

USD 65,000 - 85,000

Full time

8 days ago
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive pay and benefits
401k Match
Medical Insurance
Dental Insurance
Vision Insurance
Life Insurance
Paid Time Off
Paid Holidays

Job summary

Paslin is seeking an ERP-driven Material Scheduler/Planner at the Pontiac Plant to manage BOM integrity, work order creation, and scheduling within Dynamics AX. The role sits at the intersection of engineering, supply chain and manufacturing operations.

Ideal candidates have 5+ years in a similar planning role, strong ERP aptitude, and hands-on experience with BOMs and production workflows in a manufacturing environment.

Qualifications

  • Minimum 5 years in a similar planning role.
  • Experience with BOM management and manufacturing environments.
  • Proficiency with ERP systems and data accuracy.

Responsibilities

  • Maintain Bills of Materials (BOM) in Dynamics AX, ensuring alignment with physical builds and part details.
  • Ensure complete ERP documentation to support cross-functional execution.
  • Classify components by size, geometry, and material to optimize sourcing and production strategies.
  • Evaluate make/buy decisions based on capacity, timing and program requirements.
  • Validate and control engineering revision levels to align with production.
  • Establish and maintain item coverage settings to support uninterrupted material flow.
  • Create, release, and manage work orders for fabricated parts and tooling.
  • Collaborate with data analytics to develop and maintain production schedules aligned to customer delivery timelines.
  • Partner with Project Management and customers to resolve BOM/design discrepancies.

Skills

ERP systems
Dynamics AX
Scheduling
Communication
Organization

Tools

MS Dynamics AX

Job description

Paslin is seeking an ERP-driven Material Scheduler/Planner at the Pontiac Plant to manage BOM integrity, work order creation, and scheduling within Dynamics AX. The role sits at the intersection of engineering, supply chain and manufacturing operations.

Ideal candidates have 5+ years in a similar planning role, strong ERP aptitude, and hands-on experience with BOMs and production workflows in a manufacturing environment.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Scheduler
Scheduler

Paslin • Pontiac (MI)

On-site
USD 65,000 - 85,000
Competitive pay and benefits
401k Match
Medical Insurance
+5
ERP-Driven Fabrication Production Planner
ERP-Driven Fabrication Production Planner

& Development By Goebel Media Group • Milledgeville (GA)

On-site
USD 52,000 - 75,000
Aerospace Production Planner: ERP/MRP & Scheduling
Aerospace Production Planner: ERP/MRP & Scheduling

Axillon Aerospace, Inc. • Baltimore (MD)

On-site
USD 65,000 - 90,000
Project Materials Supervisor — Inventory & ERP Lead
Project Materials Supervisor — Inventory & ERP Lead

The Paslin Company • Pontiac (MI)

On-site
USD 70,000 - 100,000
Materials Planner - ERP & MRP Scheduler
Materials Planner - ERP & MRP Scheduler

Magna International • Birmingham (AL)

On-site
USD 70,000 - 100,000
Onsite Manufacturing Planner: ERP Scheduling & Coordination
Onsite Manufacturing Planner: ERP Scheduling & Coordination

Accelevation-LLC-1 • Memphis (TN)

On-site
USD 60,000 - 85,000
Competitive salary bonus
Paid time off
401(k) match
+2
ERP-Driven Manufacturing Planner
ERP-Driven Manufacturing Planner

Accelevation • Miamisburg (OH)

On-site
USD 28,000 - 41,000
Competitive salary
Performance bonus
Paid time off
+3
Automotive Materials Master Scheduler
Automotive Materials Master Scheduler

Piston Automotive • Auburn Hills (MI)

On-site
USD 75,000 - 95,000
Master Scheduler: ERP/MRP Planning & On-Time Delivery
Master Scheduler: ERP/MRP Planning & On-Time Delivery

PAC Seating Systems • Palm City (FL)

On-site
USD 70,000 - 95,000
Master Scheduler
Master Scheduler

Piston Automotive • Auburn Hills (MI)

On-site
USD 75,000 - 95,000