Engineering Faculty - Full-Time, Impactful Teaching

Ivy Tech Community College

Indianapolis (IN)

On-site

USD 50,000 - 55,000

Full time

3 days ago
Be an early applicant
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Benefits offered by this job

Medical plan options
Dental plan
Vision plan
Wellness program
Retirement contribution
Life insurance
Disability benefits

Job summary

Ivy Tech Community College in Indianapolis invites applications for a Full-Time Engineering Faculty member to teach and develop engineering courses, using modern classroom technologies and inclusive teaching methods.

The role emphasizes student engagement, timely grading, and participation in ABET-related activities, with a commitment to accessibility and high-quality instruction across multiple campus locations.

Qualifications

  • Master’s degree required in electrical/industrial engineering or related discipline.
  • All degrees must be from a regionally accredited institution in technology/engineering.
  • Passion for teaching engineering and communicating effectively.
  • Willingness to integrate distance learning tools and technology into instruction.
  • Experience with collaborative learning and diverse student populations.

Responsibilities

  • Deliver assigned classes in accordance with policy and course objectives.
  • Use technology to enhance instructional methods.
  • Maintain accurate student records, grades, and documentation.
  • Engage with students regularly to support learning and positive experiences.
  • Prepare ABET documentation and participate in program-level improvements.

Education

Master's degree in electrical or industrial engineering or related discipline within the program’s focus
Degrees from a regionally accredited institution in technology, engineering, or engineering technology
Strong passion for teaching engineering
Excellent verbal and written communication skills
Familiarity with distance learning tools and willingness to integrate technology
Proficiency in collaborative learning techniques and student-centered teaching methods
Ability to work with a diverse, multi-ethnic environment
Flexibility to work evenings/weekends

Job description

Ivy Tech Community College in Indianapolis invites applications for a Full-Time Engineering Faculty member to teach and develop engineering courses, using modern classroom technologies and inclusive teaching methods.

The role emphasizes student engagement, timely grading, and participation in ABET-related activities, with a commitment to accessibility and high-quality instruction across multiple campus locations.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Engineering Faculty: Inspire Online & In-Person Learning
Engineering Faculty: Inspire Online & In-Person Learning

Ivy Tech Community College of Indiana • Indianapolis (IN)

On-site
USD 50,000 - 55,000
Health plan
Dental plan
Retirement plan
+2
Engineering Faculty - Online & In-Person Teaching
Engineering Faculty - Online & In-Person Teaching

Ivy Tech Community College • Indianapolis (IN)

On-site
USD 50,000 - 55,000
Health plan options
Dental and Vision plans
Wellness program
+3
Full-Time Instructor — Advanced Manufacturing & Engineering
Full-Time Instructor — Advanced Manufacturing & Engineering

Ivy Tech Community College of Indiana • South Bend (IN)

On-site
USD 49,000 - 51,000
Health & Wellness
Dental plan
Vision plan
+4
Full Time Engineering Faculty
Full Time Engineering Faculty

Ivy Tech Community College of Indiana • Indianapolis (IN)

On-site
USD 50,000 - 55,000
Health plan
Dental plan
Retirement plan
+2
IT Faculty: Innovative Teaching & Student Success
IT Faculty: Innovative Teaching & Student Success

Ivy Tech Community College • Fort Wayne (IN)

On-site
USD 64,000 - 65,000
Health benefits
Pension plan
Paid time off
+1
IT Faculty - Innovative Tech Education & Student Mentorship
IT Faculty - Innovative Tech Education & Student Mentorship

Ivy Tech Community College of Indiana • Fort Wayne (IN)

On-site
USD 64,000 - 65,000
Health & Wellness benefits
Tuition assistance
Paid time off & holidays
+2
Dynamic Adjunct Faculty — Manufacturing & Engineering
Dynamic Adjunct Faculty — Manufacturing & Engineering

Ivy Tech Community College of Indiana • Muncie (IN)

Hybrid
USD 34,440,000 - 55,104,000
Health plan
Employee Assistance Program
Retirement benefits
+1
Adjunct Faculty: Dynamic Teaching & Course Design
Adjunct Faculty: Dynamic Teaching & Course Design

Ivy Tech Community College • Muncie (IN)

On-site
USD 55,000 - 83,000
Health & Wellness
Vision plan
Employee Assistance Program
+2
Part-Time Education Adjunct — Inspire Student Success
Part-Time Education Adjunct — Inspire Student Success

Ivy Tech Community College • Indianapolis (IN)

On-site
USD 63,000 - 73,000
Health & Wellness
Educational Benefits
Retirement benefits
Impactful Education Adjunct - Part-Time Instructor
Impactful Education Adjunct - Part-Time Instructor

Ivy Tech Community College • Indianapolis (IN)

On-site
USD 55,000 - 79,000
Health & Wellness benefits
Financial & Retirement Benefits
Educational Benefits