Engineering Change Order Specialist

Applicantz, Inc

Fremont (CA)

On-site

USD 90,000 - 120,000

Full time

2 days ago
Be an early applicant

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

Applicantz is seeking a Documentation and Change Order specialist in Fremont, CA to manage ECOs, perform data mining, and support PLM change control processes. The role involves coordinating with engineers, maintaining trackers, and generating reports in a fast-paced environment.

The ideal candidate will have a Bachelor's in Engineering, proficiency with NX CAD and Teamcenter PLM, and strong meeting facilitation and documentation skills.

Qualifications

  • Bachelor's Degree in Engineering is required.
  • Experience with change control processes and PLM is preferred.
  • Strong communication and documentation skills are essential.

Responsibilities

  • Generates and manages Change Orders through closure.
  • Performs documentation research for parts/assemblies for Engineering Change Orders.
  • Support NPI PMs on ECO activities.
  • Coordinate with Engineers/Designers for BOM alignment with lean manufacturing.
  • Facilitate design review meetings and capture decisions and actions.

Skills

Strong communication
Meeting facilitation
Detail oriented
Multitasking
Team player

Education

Bachelor's Degree in Engineering

Tools

Siemans NX CAD
Teamcenter PLM
Enovia
Windchill
Agile

Job description

  • Drafting using Siemans NX CAD (or NX, Solidworks, or Creo)
  • Change Management using Teamcenter PLM (or Enovia, Windchill, or Agile)
  • Strong communications skills; able to facilitate meetings and send minutes with actions and decisions.
  • Bachelor's Degree in Engineering required.

Looking for a Documentation and Change Order (ECR/ECO) specialist responsible for engineering change control process as part of PLM. Beyond generating and processing Change Orders, duties will include data mining, POC for change related escalations, managing trackers, inter department reports and CIP activities in a high pace environment.

Responsibilities:
  • Generates and manages Change Orders (CO) thru closure.
  • Performs documentation research for all parts/assemblies to be included in the Engineering Change Order to ensure accuracy, completeness, and adherence to change control policies/procedures and design drafting standards. Makes decisions, provides recommendations and/or escalates based on the needs of the situation.
  • Supports NPI PMs (New Product Introduction Program Managers) on a daily basis for Engineering Change Order activities.
  • Interfaces with Engineers and Designers on design solutions into BOMs that align with lean manufacturing requirements.
  • Responsible to align key collaborators to drive to solutions in alignment with cutin strategies, E&O and effectivities.
  • POC for Change Control processes in Engineering.
  • Monitor and prioritize tasks to ensure efficient and timely change cut in.
  • Process part numbers, bills of material and change orders which include preparation for change control board, review for clarity, errors and proper approval routing, accuracy and completeness.
  • Track documents from initiation to final approval.
  • Tracking and reporting on document review progress .
  • Develop, track and report key metrics.
  • Generate and manage documentation in support of ISO standards including revise and releases.
  • Update drawing from model changes.
  • Support engineering and design team on drawing and spec updates.
  • Facilitate Design review meetings and act as a coordinator .
  • Capture Key decision, action items and send detailed meeting minutes.
Requirements:
  • Ability to operate efficiently and effectively in a fast-paced environment.
  • Thorough understanding of change management and configuration management practices.
  • Ability to work required overtime to support manufacturing needs and requests from our customers.
  • Superior verbal and written communication skills.
  • Demonstrated analytical abilities with strong attention to detail.
  • Must be driven and self-motivated as well as a team player.
  • Ability to multitask and work well under pressure.
  • Experience in resolving scheduling conflicts and accommodating last minute changes with competing priorities.
  • Solid Microsoft Office Suite skills, especially in Excel (Pivot Tables, Vlookup, Formatting, Graphing), also MS Teams, PowerPoint, and Word.
  • iPLM/SAP experience (preferred).
  • Team center and NX Experience (preferred).
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

PLM Change Control Specialist
PLM Change Control Specialist

Applicantz, Inc • Fremont (CA)

On-site
USD 75,000 - 110,000
Engineering Change Order Specialist
Engineering Change Order Specialist

Applicantz, Inc • Fremont (CA)

On-site
USD 70,000 - 95,000
PLM Documentation & Change Order Specialist
PLM Documentation & Change Order Specialist

Applicantz, Inc • Fremont (CA)

On-site
USD 90,000 - 120,000
Engineering Change Specialist
Engineering Change Specialist

H.T. Prof Executive Search • Farmington (CT)

On-site
USD 85,000 - 110,000
ECN Orchestrator: Cross-Functional Change Leader
ECN Orchestrator: Cross-Functional Change Leader

H.T. Prof Executive Search • Farmington (CT)

Hybrid
USD 85,000 - 110,000
ECR Change Coordinator
ECR Change Coordinator

Brose Sitech Group • Blythewood (SC)

On-site
USD 85,000 - 125,000
Stable employment
Professional development opportunities
Engineering Change Services
Engineering Change Services

Ryzen Solutions • Fremont (CA)

On-site
USD 48,000 - 63,000
Health, dental, and vision insurance
401(k) with company match
Professional development opportunities
+1
Engineering Change Specialist
Engineering Change Specialist

Aminov Search Partners • Farmington (CT)

On-site
USD 85,000 - 115,000
Engineering Change Coordinator Intern (ERP & BOM)
Engineering Change Coordinator Intern (ERP & BOM)

Forensics Source • Jacksonville (FL)

Hybrid
USD 55,000 - 75,000
PLM Change Control Lead (ECR/ECO)
PLM Change Control Lead (ECR/ECO)

Applicantz, Inc • Fremont (CA)

On-site
USD 90,000 - 120,000