Electrical PM - Data Center Construction (Field)

Turner & Townsend

Charlotte (NC)

On-site

USD 120,000 - 160,000

Full time

9 hours ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

Turner & Townsend is seeking an Electrical Project Manager – Data Center Construction with field experience to oversee a high-profile data center project in Charlotte. You will manage the General Contractor’s construction activities, report schedule status to the project owner, and bring deep field technical expertise and strong leadership to a complex mission-critical environment.

The role requires collaboration with owners, architects, contractors and regional stakeholders, rigorous tracking

Qualifications

  • Bachelor’s degree required in Electrical Engineering, Construction Management, or related field.
  • Minimum 5+ years of electrical project management experience, preferably in data center construction or with an electrical contractor.
  • Experience with substation and power distribution systems preferred.
  • Familiarity with MEP design.
  • Strong leadership, communication, and problem-solving skills.
  • Proficiency in project management tools.
  • Knowledge of relevant codes, standards, and construction methodologies.
  • Proficiency in the Data Center Commissioning Process (levels 1–5).
  • Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/Es, equipment submittals and RFIs.
  • Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools.

Responsibilities

  • Effectively manage and collaborate with project stakeholders.
  • Provide clear communication across internal teams for consistent client delivery.
  • Analyze, track, and manage critical milestone activities to avoid schedule slips.
  • Verify project governance, processes and systems are utilized.
  • Ensure best practices on all projects.
  • Produce formal project status reports and other reports as required.
  • Monitor progress of multiple construction projects to ensure standards are applied.
  • Manage interface between suppliers through trackers and reviews.
  • Maintain project information flow via meetings and written communications.
  • Forecast and update key project milestones.
  • Lead local design teams per commission criteria.
  • Provide technical support to owners, architects, contractors and regional stakeholders.
  • Respond rapidly to RFIs from the field.
  • Contribute to cost control, value engineering, and constructability guidance.
  • Review status reports, drawings submittals, timelines and costs from teams.

Skills

Leadership
Communication
Problem-solving

Education

Bachelor’s degree in Electrical Engineering, Construction Management, or related field

Tools

Excel
Word
PowerPoint
Outlook
Procore
P6
CxAlloy

Job description

Turner & Townsend is seeking an Electrical Project Manager – Data Center Construction with field experience to oversee a high-profile data center project in Charlotte. You will manage the General Contractor’s construction activities, report schedule status to the project owner, and bring deep field technical expertise and strong leadership to a complex mission-critical environment.

The role requires collaboration with owners, architects, contractors and regional stakeholders, rigorous tracking

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Electrical Data Center Construction Project Manager (Field)
Electrical Data Center Construction Project Manager (Field)

Turner & Townsend • Charlotte (NC)

On-site
USD 110,000 - 170,000
Data Center Electrical PM — Field Leader
Data Center Electrical PM — Field Leader

Turner & Townsend • Phoenix (AZ)

On-site
USD 120,000 - 180,000
Data Center Electrical PM | QC & Field Leader
Data Center Electrical PM | QC & Field Leader

Turner & Townsend • Maiden (NC)

On-site
USD 100,000 - 150,000
Data Center Electrical Project Manager – Field Leader
Data Center Electrical Project Manager – Field Leader

Turner & Townsend • Alexandria (VA)

On-site
USD 110,000 - 150,000
Data Center Mechanical PM - Field Lead
Data Center Mechanical PM - Field Lead

Turner- • Amarillo (TX)

On-site
USD 135,000 - 175,000
Electrical QA/QC Lead for Mission-Critical Data Centers
Electrical QA/QC Lead for Mission-Critical Data Centers

Turner & Townsend • Maiden (NC)

On-site
USD 120,000 - 165,000
Field-Enabled Mechanical PM for Data Centers
Field-Enabled Mechanical PM for Data Centers

Turner & Townsend • Alexandria (VA)

On-site
USD 120,000 - 180,000
Data Center Electrical Project Manager - Field Leader
Data Center Electrical Project Manager - Field Leader

Turner & Townsend • Amarillo (TX)

On-site
USD 135,000 - 175,000
Quality Assurance PM – Electrical - Data Center Construction
Quality Assurance PM – Electrical - Data Center Construction

Turner & Townsend Limited • Frederick (MD)

On-site
USD 90,000 - 130,000
Data Center Mechanical Project Lead
Data Center Mechanical Project Lead

Turner & Townsend • Phoenix (AZ)

On-site
USD 110,000 - 160,000