Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Energy Jobline ZR seeks an Environmental, Health & Safety (EHS) Manager for an on-site role in Herndon, VA. The position is a full-time W-2 with hourly compensation of $45.00–$50.00 and a per diem of $1,000/week for qualified travelers.
The role requires leading EHS compliance, daily inspections, trainings, and coordination with leadership and subcontractors to uphold OSHA standards on a data center/mission-critical construction site.
Energy Jobline ZR seeks an Environmental, Health & Safety (EHS) Manager for an on-site role in Herndon, VA. The position is a full-time W-2 with hourly compensation of $45.00–$50.00 and a per diem of $1,000/week for qualified travelers.
The role requires leading EHS compliance, daily inspections, trainings, and coordination with leadership and subcontractors to uphold OSHA standards on a data center/mission-critical construction site.