On-Site HSE Advisor for Data Center Construction

ERM

Virginia Beach (VA)

Vor Ort

USD 104.000 - 116.000

Vollzeit

Vor 4 Tagen
Sei unter den ersten Bewerbenden

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Paid time off
Parental leave
Medical
Dental
Vision
Life
Disability
AD&D insurance
401(k)

Zusammenfassung

ERM is hiring an experienced HSE Owners Advisor to provide on-site support for a key technology client in Northern, VA. The role focuses on promoting safe construction practices and ensuring contractor compliance with health, safety, and environmental requirements on data center development projects.

This full-time, 40-hour week, limited-term position offers a base pay range of $103,800 to $115,900 per year, with potential for extension and bonus eligibility.

Qualifikationen

  • Bachelor's degree in Environmental Science, Occupational Safety, Engineering, Construction Management, or a related field preferred.
  • 5+ years of experience supporting construction safety, environmental compliance, or EHS programs on large construction projects.
  • Experience conducting field inspections and compliance observations.
  • Working knowledge of OSHA construction standards.
  • Familiarity with construction stormwater management, erosion and sediment controls, and environmental compliance requirements during construction.
  • Strong written communication and documentation skills.
  • Ability to work independently in an active construction environment.

Aufgaben

  • Conduct routine site inspections and field observations of construction activities.
  • Monitor contractor compliance with project safety requirements and applicable regulations.
  • Participate in daily construction coordination and pre-task planning meetings as needed.
  • Review Job Hazard Analyses (JHAs), pre-task plans, and other safety-related documentation.
  • Identify unsafe conditions and behaviors and communicate observations to the client representative.
  • Document safety observations, trends, concerns, and areas for improvement.
  • Support incident reviews, fact gathering, and documentation efforts.
  • Maintain project safety records and inspection documentation.
  • Prepare routine safety observation and compliance reports.
  • Conduct routine inspections to verify compliance with environmental requirements applicable to construction activities.
  • Monitor construction stormwater controls, erosion and sediment control measures, and site housekeeping practices.
  • Verify implementation and maintenance of best management practices (BMPs).
  • Monitor chemical storage, fuel storage, spill prevention measures, and hazardous material management practices.
  • Observe waste management activities and identify potential compliance concerns.
  • Document environmental observations and communicate compliance concerns to the client representative.
  • Maintain records of environmental inspections, observations, and corrective action status provided by others.
  • Support environmental incident documentation and reporting efforts as directed by the client representative.
  • Verify implementation of environmental permit and approval requirements applicable to construction activities.
  • Maintain inspection logs, field notes, and compliance documentation.
  • Track observed safety and environmental issues through established project reporting processes.
  • Prepare daily, weekly, and monthly compliance summaries as required.
  • Escalate significant safety or environmental concerns to the client representative.
  • Support audits and compliance reviews by providing project documentation and field observations.

Kenntnisse

Construction safety
Environmental compliance
Field inspections
OSHA standards
Written communication
Independent work

Ausbildung

Bachelor's degree

Jobbeschreibung

ERM is hiring an experienced HSE Owners Advisor to provide on-site support for a key technology client in Northern, VA. The role focuses on promoting safe construction practices and ensuring contractor compliance with health, safety, and environmental requirements on data center development projects.

This full-time, 40-hour week, limited-term position offers a base pay range of $103,800 to $115,900 per year, with potential for extension and bonus eligibility.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

On-Site HSE Advisor for Data Center Construction
On-Site HSE Advisor for Data Center Construction

Environmental Resources Management, Inc. • Richmond (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical, dental, vision, life, and AD&
On-Site HSE Owner Advisor for Data Center Projects
On-Site HSE Owner Advisor for Data Center Projects

ERM • Blacksburg (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical
+6
On-Site HSE Advisor for Data Center Projects
On-Site HSE Advisor for Data Center Projects

ERM • Williston (ND)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical insurance
+6
Data Center HSE On-Site Advisor (6-Month)
Data Center HSE On-Site Advisor (6-Month)

ERM • Roanoke (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical
+7
On-Site HSE Advisor for Data Center Projects
On-Site HSE Advisor for Data Center Projects

Environmental Resources Management Iberia • Richmond (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Medical, dental, vision
401(k)
HSE Owner Advisor (Field Based)
HSE Owner Advisor (Field Based)

Environmental Resources Management Iberia • Richmond (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Medical, dental, vision
401(k)
On-Site HSE Advisor — Data Center Safety Leader
On-Site HSE Advisor — Data Center Safety Leader

5C Group • Phoenix (AZ)

Vor Ort
USD 100.000 - 120.000
Equal opportunity employer
Travel up to 15%
HSE Advisor: Data Center Construction Safety Lead
HSE Advisor: Data Center Construction Safety Lead

5C Group • Springfield (OH)

Vor Ort
USD 100.000 - 120.000
HSE Owner Advisor (Field Based)
HSE Owner Advisor (Field Based)

ERM • Roanoke (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical
+7
HSE Owner Advisor (Field Based)
HSE Owner Advisor (Field Based)

ERM • Blacksburg (VA)

Vor Ort
USD 104.000 - 116.000
Paid time off
Parental leave
Medical
+6