Data Center Construction Safety Lead

CBRE

Wichita Falls (TX)

On-site

USD 70,000 - 100,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

CBRE is seeking an experienced construction safety professional to monitor EHS performance on data center projects and ensure GC compliance. Relocation assistance is possible for the right candidate, with onsite opportunities in TX including Abilene, Haskell, Vernon or Wichita Falls.

The role requires strong safety program oversight, site tours, risk assessments and collaboration with owners and management reps. A degree or equivalent experience is acceptable with 5+ years in safety roles.

Qualifications

  • Bachelor's degree in Architecture, Engineering, Construction Management, or related field; experience considered without degree.
  • Minimum five years of construction safety representative experience; data center or mission critical preferred.
  • At least 2 years supporting safety programs and overseeing GC + subs compliance with safety codes.
  • Proficient with MS Office and Google Suite; ability to read architectural drawings; knowledge of MS Project, leases and contracts.
  • Familiar with building codes and systems; detail oriented and highly organized.
  • Ground-up construction experience including MEP, heavy equipment, environmental and electrical safety (NFPA 70e, NEC) preferred.

Responsibilities

  • Monitor GC EHS performance and compliance with contract and regulatory requirements.
  • Provide data on EHS performance, including KPIs and incident management.
  • Participate in safety meetings and notices to communicate EHS information.
  • Conduct daily site tours and safety walks with GC and owner's rep.
  • Coach safety committee and support risk assessments.
  • Investigate Significant Incidents and SPE.
  • Escalate non-compliance to GC and owner management reps.
  • Ensure EHS data submitted by GC is accurate and timely.
  • Conduct monthly GC EHS evaluations.
  • Issue weekly EHS summary.
  • Oversee Boots on the Ground program.
  • Support design reviews across Life Cycle and development of the DCCEHSP.
  • Other duties as assigned.

Skills

Construction safety
Reading drawings
MS Office
Google Suite
MS Project
Detail oriented
Organization
Safety program support

Education

Bachelor's degree or equivalent

Tools

MS Project

Job description

CBRE is seeking an experienced construction safety professional to monitor EHS performance on data center projects and ensure GC compliance. Relocation assistance is possible for the right candidate, with onsite opportunities in TX including Abilene, Haskell, Vernon or Wichita Falls.

The role requires strong safety program oversight, site tours, risk assessments and collaboration with owners and management reps. A degree or equivalent experience is acceptable with 5+ years in safety roles.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Data Center EHS Lead — Onsite Safety & Compliance (Relocation)
Data Center EHS Lead — Onsite Safety & Compliance (Relocation)

CBRE • Abilene (TX)

On-site
USD 80,000 - 120,000
Onsite Data Center Safety Leader & Risk Coach
Onsite Data Center Safety Leader & Risk Coach

CBRE Group, Inc. • Amarillo (TX)

On-site
USD 90,000 - 130,000
Relocation assistance
Construction Safety Facilitator
Construction Safety Facilitator

CBRE • Abilene (TX)

On-site
USD 80,000 - 120,000
Construction Safety Facilitator
Construction Safety Facilitator

CBRE Group, Inc. • Amarillo (TX)

On-site
USD 90,000 - 130,000
Relocation assistance
Construction Safety Facilitator
Construction Safety Facilitator

CBRE • Wichita Falls (TX)

On-site
USD 70,000 - 100,000
Onsite Construction Safety Leader – Data Center
Onsite Construction Safety Leader – Data Center

Environmental Resources Management, Inc. in • Houston (TX)

On-site
USD 90,000 - 130,000
Data Center Construction Safety Lead
Data Center Construction Safety Lead

Big G Electric & Engineering, LLC • Abilene (TX)

On-site
USD 60,000 - 80,000
Medical coverage through FEHB
401(k) with employer match
Vacation
+2
Site Safety Lead – Data Center Construction (Housing)
Site Safety Lead – Data Center Construction (Housing)

KS Staffing Group • Abilene (TX)

On-site
USD 28,000 - 40,000
Housing provided
Local position – no per diem
Data Center Safety Lead – Construction
Data Center Safety Lead – Construction

CBRE • Sparks (NV)

On-site
USD 90,000 - 120,000
Relocation assistance
Sign-on bonuses may be available
On-Site Data Center Construction Safety Lead
On-Site Data Center Construction Safety Lead

Turner- • Dallas (TX)

On-site
USD 90,000 - 125,000