Get more replies from employers
Send a job-specific resume in minutes.
ACCIONA is seeking a Cost Control Engineer for the SR400 Express Lanes Project in Sandy Springs, Georgia. This role involves tracking cost accruals, performing reconciliations, and managing financial reporting for a $4.6 billion infrastructure initiative.
The ideal candidate will have a Bachelor’s degree in Engineering, Finance, or a related field and a minimum of 4 years of relevant experience. ACCIONA offers a competitive salary, relocation assistance, and a comprehensive benefits package.
SR400 Express Lanes Project is a $4.6 billion infrastructure initiative led by SR400 Constructors, a 50/50 joint venture between Flatiron Dragados and ACCIONA. Commissioned by the Georgia Department of Transportation (GDOT) and Georgia State Road Tollway Authority (SRTA), the project will add two 16‑mile express lanes from Sandy Springs MARTA Station (Exit 5) to McFarland (Exit 12), enhancing mobility along one of Georgia’s busiest corridors. With a peak workforce of over 500, the project also includes dedicated bus rapid transit stations and key bridge refurbishments. Construction is set to begin in late 2025, with substantial completion anticipated in 2031.
Cost Control Engineer
To perform this job successfully, an individual must be able to perform each essential duty satisfactorily:
Acciona offers a competitive salary, relocation assistance where relocation is required and approved, 401(k) retirement plan, medical, dental, vision, life, short and long‑term disability benefits, tuition reimbursement, paid time off, and more.