Community Kitchen Supervisor - Full-Time, Impactful Service

Dismas Charities, Inc.

Montgomery (AL)

Sur place

USD 26 000 - 37 000

Plein temps

Il y a 9 jours

Une candidature complète en une minute

Un CV et une lettre de motivation personnalisés, prêts à envoyer.

Passez les filtres ATS

Résumé du poste

Dismas Charities, Inc. is seeking a dedicated kitchen associate to prepare meals and supplements for residents in a community-based setting.

The role emphasizes menu adherence, inventory control, and collaboration with leadership to ensure quality, safety, and regulatory compliance. The position is full-time, on-site, with shifts across mornings, afternoons and nights, and requires flexibility to cover weekends and holidays as needed.

Qualifications

  • Two years of paid food service experience with administrative duties such as food ordering, budget management, inspection planning and compliance.

Responsabilités

  • Prepares meals and supplements for facility residents; ensures all aspects of the food service operation comply with applicable regulations and the approved menu schedule.
  • Assists Director in planning and implementing menus and posts advanced notification of substitutions.
  • Manages inventory and ordering of food and prep equipment; networks with local food banks and community resources.
  • Maintains sanitary and safety standards and cleanliness of kitchen, serving and prep areas.
  • Maintains required written records regarding the food service operation.
  • Follows procedures and policies including emergency drills and life safety.
  • Works the hours necessary to staff the center and attends required appointments/meetings on site.

Connaissances

Cooking
Inventory management
Budget management
Menu planning
Safety compliance

Description du poste

Dismas Charities, Inc. is seeking a dedicated kitchen associate to prepare meals and supplements for residents in a community-based setting.

The role emphasizes menu adherence, inventory control, and collaboration with leadership to ensure quality, safety, and regulatory compliance. The position is full-time, on-site, with shifts across mornings, afternoons and nights, and requires flexibility to cover weekends and holidays as needed.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Full-Time Cook & Kitchen Supervisor
Full-Time Cook & Kitchen Supervisor

Dismas Charities Inc • Nashville (TN)

Sur place
USD 26 000 - 37 000
Competitive pay
Benefits package
Indoor work
Cook (Full-Time)
Cook (Full-Time)

Dismas Charities • Nashville (TN)

Sur place
USD 26 000 - 37 000
Competitive pay
Benefits package
Indoor work
Cook (Full-Time, Part-Time, & Relief)
Cook (Full-Time, Part-Time, & Relief)

Dismas Charities • Sioux Falls (SD)

Sur place
USD 23 423 - 33 360
Health insurance
Dental insurance
Vision insurance
+4
Cook (Full-Time)
Cook (Full-Time)

Dismas Charities, Inc. • Montgomery (AL)

Sur place
USD 26 000 - 37 000
Community Kitchen Cook – Sign-On Bonus & Flexible Shifts
Community Kitchen Cook – Sign-On Bonus & Flexible Shifts

Dismas Charities • Sioux Falls (SD)

Sur place
USD 23 423 - 33 360
Health insurance
Dental insurance
Vision insurance
+4
Community Kitchen Supervisor: Lead Meals & Team
Community Kitchen Supervisor: Lead Meals & Team

UNAVAILABLE • Tacoma (WA)

Sur place
USD 53 000 - 66 000
3 weeks vacation
12 days sick leave
13 holidays
+6
Kitchen Supervisor-Cook
Kitchen Supervisor-Cook

CATHOLIC CHARITIES OF LOS ANGELES INC • Los Angeles (CA)

Sur place
USD 26 000 - 28 000
Life Insurance
401a/403b Retirement Plan
Flexible Spending Account
+7
Part-Time Kitchen Supervisor - Meals with Dignity & Hope
Part-Time Kitchen Supervisor - Meals with Dignity & Hope

Catholic Charities of Long Island • Coram (NY)

Sur place
USD 26 000 - 29 000
Impactful Kitchen & Shelter Meals Coordinator
Impactful Kitchen & Shelter Meals Coordinator

Housing-Matters • Santa Cruz (CA)

Sur place
USD 32 000 - 36 000
Medical plans
Dental coverage
Vision coverage
+4
Kitchen Supervisor-Cook
Kitchen Supervisor-Cook

JVC Northwest • Los Angeles (CA)

Sur place
USD 26 000 - 28 000
Life Insurance
401a/403(b) retirement plan
Flexible Spending Account
+7