Singapore Data Centre Construction Lead – On-site & Safety

Turner & Townsend

Singapore

On-site

SGD 150,000 - 210,000

Full time

2 days ago
Be an early applicant
Application generator

Turn this role into an interview — a resume and cover letter built around what this employer wants.

Get past ATS filters

Job summary

Turner & Townsend Singapore is seeking an experienced Construction Manager to oversee on-site construction for a data centre build. The role emphasizes site logistics, safety, sequencing, and ensuring the general contractor maintains the critical path within tight industrial zones.

You will coordinate trades, manage deep foundation work, perform QA/QC, and liaise with RIs and QPs to pass inspections, while upholding MOM safety standards and driving defect resolution.

Qualifications

  • 8+ years of site construction management experience, with data centre or high-tech facilities in Singapore.
  • Deep knowledge of deep-piling, precast and cast-in-situ concrete structures.
  • PM software proficiency: Procore for logs/inspections; ACC to view 3D models; Smartsheet for schedules.

Responsibilities

  • Direct daily on-site construction logistics in tight industrial zones (e.g., Tuas, Jurong).
  • Supervise deep foundation work, ERSS, mass concrete pours, and precast components.
  • Lead trade coordination meetings and manage handovers between civil and MEP teams; ensure clear utility paths.
  • Enforce MOM safety regulations; oversee high-risk tasks such as heavy lifting and working at heights.
  • Conduct site walks for QA/QC against shop drawings; drive NCR closure and corrective actions.
  • Coordinate on-site inspections with Registered Inspectors (RIs) and Qualified Persons (QPs).

Skills

Site management
Safety management
Project coordination
Trade coordination

Education

Bachelor's degree in Civil Engineering, Building, or Construction Management
BCSS or CSOC certification

Tools

Procore
ACC (Autodesk Construction Cloud)
Smartsheet

Job description

Turner & Townsend Singapore is seeking an experienced Construction Manager to oversee on-site construction for a data centre build. The role emphasizes site logistics, safety, sequencing, and ensuring the general contractor maintains the critical path within tight industrial zones.

You will coordinate trades, manage deep foundation work, perform QA/QC, and liaise with RIs and QPs to pass inspections, while upholding MOM safety standards and driving defect resolution.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Construction Manager – Data Centre PMC (West Area)
Construction Manager – Data Centre PMC (West Area)

Turner & Townsend • Singapore

On-site
SGD 150,000 - 210,000
Data Centre Pre-Construction Lead
Data Centre Pre-Construction Lead

Turner & Townsend • Singapore

On-site
SGD 120,000 - 190,000
Data Centre Build Project Manager
Data Centre Build Project Manager

Turner & Townsend • Singapore

On-site
SGD 120,000 - 180,000
On-Site Construction Project Manager
On-Site Construction Project Manager

DATUMSTRUCT (CFS) PTE. LTD. • Singapore

On-site
SGD 67,000 - 112,000
Data Centre Construction Manager: M&E & Critical Infra Lead
Data Centre Construction Manager: M&E & Critical Infra Lead

ENGIE Southeast Asia • Singapore

On-site
SGD 100,000 - 167,000
Site Construction Lead: Scheduling, Safety & Quality
Site Construction Lead: Scheduling, Safety & Quality

FRAMEWORK BUILDING SERVICES (PTE. LTD.) • Singapore

On-site
SGD 42,000 - 63,000
Site Construction Lead: Safety, Schedule & Quality
Site Construction Lead: Safety, Schedule & Quality

gmp technologies (s) pte ltd • Singapore

On-site
SGD 120,000 - 180,000
Site Engineer — Infrastructure & Data Centre Projects
Site Engineer — Infrastructure & Data Centre Projects

M&S Management & Contracts Services Pte Ltd • Singapore

On-site
SGD 66,000 - 79,000
On-Site Construction Lead
On-Site Construction Lead

HITACHI PLANT SERVICES CO., LTD. • Singapore

On-site
SGD 90,000 - 130,000
Site Lead - Construction & Safety Coordinator
Site Lead - Construction & Safety Coordinator

Lie Yang Construction • Singapore

On-site
SGD 60,000 - 90,000