Senior Construction Scheduler — P6 & 4D BIM Lead

BRK Pte Ltd

Singapore

On-site

SGD 120,000 - 180,000

Full time

8 days ago
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

BRK Pte Ltd in Singapore seeks an experienced Scheduler to lead construction planning using Primavera P6 and 4D BIM for complex projects. You will ensure programme control, identify risks, and collaborate with stakeholders across packages.

The role requires strong Excel analytics and proficiency in Microsoft Project, PowerPoint, and Word to produce clear project reports and presentations.

Qualifications

  • Degree in architecture, engineering, or a related field accredited by PEB/BOA Singapore or equivalent.
  • Experience with Primavera P6 and 4D BIM is essential.
  • Proven ability to lead scheduling for complex projects.

Responsibilities

  • Develop, review, and control construction programmes using Primavera P6.
  • Independently assess contractors’ schedules to identify critical paths and delays.
  • Integrate 4D BIM models with scheduling data for visualization and coordination.
  • Flag interface and handover risks between project packages.
  • Apply EOT concepts to manage schedule impacts.
  • Prepare reports using Excel, PowerPoint, and Word.

Skills

Primavera P6
4D BIM
Stakeholder communication
Project management
Data analysis

Education

Degree in architecture, engineering, or related field (PEB/BOA Singapore)

Tools

Microsoft Excel
Power Query
Pivot Tables
Microsoft Project
PowerPoint
Word

Job description

BRK Pte Ltd in Singapore seeks an experienced Scheduler to lead construction planning using Primavera P6 and 4D BIM for complex projects. You will ensure programme control, identify risks, and collaborate with stakeholders across packages.

The role requires strong Excel analytics and proficiency in Microsoft Project, PowerPoint, and Word to produce clear project reports and presentations.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

SCHEDULER
SCHEDULER

BRK Pte Ltd • Singapore

On-site
SGD 120,000 - 180,000
Senior Scheduler - Large-Scale Construction (P6 & 4D BIM)
Senior Scheduler - Large-Scale Construction (P6 & 4D BIM)

a-star testing & inspection (s) pte. ltd. • Singapore

On-site
SGD 110,000 - 170,000
Senior Construction Planning & Scheduling Lead
Senior Construction Planning & Scheduling Lead

JTE Recruit Pte Ltd • Singapore

On-site
SGD 122,000 - 146,000
Contract (min 1 year)
Salary up to SGD 12,000 per month
Senior Scheduler: 4D BIM & Primavera P6 Expert
Senior Scheduler: 4D BIM & Primavera P6 Expert

CUTECH QUALITY SOLUTIONS PTE. LTD. • Singapore

On-site
SGD 89,000 - 156,000
Senior Planning Engineer - Civil (Primavera P6 & BIM 4D)
Senior Planning Engineer - Civil (Primavera P6 & BIM 4D)

Gamuda Berhad Singapore Branch • Singapore

On-site
SGD 90,000 - 130,000
Senior 4D BIM & Project Controls Lead
Senior 4D BIM & Project Controls Lead

Penta Ocean Construction • Singapore

On-site
SGD 180,000 - 240,000
Senior Planning Engineer – Schedule Expert (Primavera P6)
Senior Planning Engineer – Schedule Expert (Primavera P6)

Private Advertiser • Singapore

On-site
SGD 90,000 - 130,000
Senior Planning Engineer - Construction Schedules (P6)
Senior Planning Engineer - Construction Schedules (P6)

THE SUPREME HR ADVISORY PTE. LTD. • Singapore

On-site
SGD 62,000 - 76,000
Senior Construction Planning Lead (Primavera)
Senior Construction Planning Lead (Primavera)

THE SUPREME HR ADVISORY PTE. LTD. • Singapore

On-site
SGD 67,000 - 82,000
Strategic Project Controls Lead - 4D BIM & CPM Optimization
Strategic Project Controls Lead - 4D BIM & CPM Optimization

penta-ocean construction company limited • Singapore

On-site
SGD 120,000 - 180,000