Data Centre - Construction Manager

Ambitek UAE

Riyadh

On-site

SAR 500,000 - 900,000

Full time

43 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Ambitek UAE is seeking a senior site supervisor for a large data centre build in central Saudi Arabia. You will lead civil, structural, architectural, MEP, ICT and ELV works from mobilisation through Level 1 to Level 5 commissioning and handover to operations.

The role requires an engineering degree and 15+ years in construction management or data centre delivery, with hands-on testing and commissioning; Saudi Council of Engineers accreditation is required or to be pursued.

Qualifications

  • Engineering degree in mechanical, electrical or civil.
  • 15+ years in construction management, data centre or mission-critical delivery.
  • Hands-on testing and commissioning experience.

Responsibilities

  • Lead site across civil, structural, architectural, MEP, ICT and ELV works.
  • Review method statements, submittals and shop drawings.
  • Track long-lead equipment and advise on constructability and VE input.
  • Mentor site engineers and supervisors on site.
  • Ensure commissioning and handover to operations aligns with programme.

Skills

Site supervision
MEP coordination
NCR management
Submittals tracking

Education

Engineering degree (Mech/Elec/Civil)

Job description

Remote site within reach of Riyadh, Saudi Arabia

Ref AMB/PR/2611/005

You are the person on site who knows exactly where the power train is against programme, which chiller is late, and whether the contractor will really be ready for integrated systems testing.

Right now you are probably running one package of a data centre, or running the whole site for a contractor whose commercial targets shape every decision you make. You spend your days closing NCRs, chasing submittals and walking the white space before the IT equipment arrives.

What wears you down is rarely the engineering. It is being measured on the contractor’s margin rather than on whether the facility works first time, and watching commissioning get squeezed because the programme slipped months earlier.

Stay where you are and the next three years will probably look like the last three: another package, another handover rush, the same view from the same side of the table.

This role puts you on the supervision side of a large, mission-critical data centre build in central Saudi Arabia, working for an international engineering consultancy. You lead the site across civil, structural, architectural, MEP, ICT and ELV works, from mobilisation through Level 1 to Level 5 commissioning and handover to operations. You review method statements, submittals and shop drawings, track long-lead equipment, give constructability and value engineering input, and mentor the site engineers and supervisors around you.

You need an engineering degree in mechanical, electrical or civil, 15 years or more in construction management, data centre or mission-critical delivery, and hands‑on testing and commissioning. Remote sites will not surprise you. Saudi Council of Engineers accreditation is needed before mobilisation; if you do not hold it yet, we will talk you through it.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Data Center Construction Lead - Remote Saudi Site
Senior Data Center Construction Lead - Remote Saudi Site

Ambitek UAE • Riyadh

On-site
SAR 500,000 - 900,000
Data Centre Construction Manager
Data Centre Construction Manager

WSP Global Inc. • Riyadh

On-site
SAR 450,000 - 650,000
Data Centre Construction Lead – On-Site Delivery
Data Centre Construction Lead – On-Site Delivery

WSP Global Inc. • Riyadh

On-site
SAR 450,000 - 650,000
Data Centre Design Engineer
Data Centre Design Engineer

GENTEC - Haji Ali Reza & Co. • Saudi Arabia

On-site
SAR 260,000 - 380,000
Senior Mechanical Engineer- Data Centre
Senior Mechanical Engineer- Data Centre

WSP Global Inc. • Riyadh

On-site
SAR 262,467 - 337,457
MEP Construction Manager Data Centre
MEP Construction Manager Data Centre

WSP Global Inc. • Riyadh

On-site
SAR 90,000 - 130,000
Senior Mechanical Engineer- Data Centre
Senior Mechanical Engineer- Data Centre

WSP Global Inc. • Riyadh

On-site
SAR 334,800 - 502,200
Senior Project Manager / Resident Engineer
Senior Project Manager / Resident Engineer

Savills • Riyadh

On-site
SAR 360,000 - 480,000
Senior Mechanical Engineer (MCF/ Data Centres) - Riyadh
Senior Mechanical Engineer (MCF/ Data Centres) - Riyadh

Haskoning • Riyadh

On-site
SAR 350,000 - 600,000
4-day week
Remote work day
25 days leave
+3
Project Director - Data Centre
Project Director - Data Centre

Digby Morris Executive Search & Talent Acquisition • Saudi Arabia

On-site
GBP 364,000 - 485,000
Tax-free expatriate package