Fire Protection Engineers (Data Centre Construction) JB

AG STAFFING

Pasir Gudang

On-site

MYR 90,000 - 150,000

Full time

42 hours ago
Be an early applicant
Application generator

Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

AG STAFFING in Malaysia seeks a Fire Protection Engineer to design and supervise fire protection systems for data centers, ensuring compliance with life-safety laws.

The role oversees specialized suppression (Pre-Action sprinklers, Gas suppression like FM-200, Novec 1230), early detection with VESDA and smoke detectors, room integrity testing, and CCC clearance from Jabatan Bomba dan Penyelamat, plus integration with doors, access control, and HVAC shutdowns.

Qualifications

  • Experience in designing fire protection systems for high-sensitivity data centers.
  • Understanding of life-safety regulations and compliance requirements.

Responsibilities

  • Oversee installation of data center fire systems including Pre-Action sprinklers and gas suppression.
  • Supervise VESDA and smoke detector networks for early detection.
  • Manage room integrity testing and CCC clearance from Jabatan Bomba dan Penyelamat.
  • Ensure life-safety integration with fire doors, access control overrides, and HVAC shutdowns during emergencies.

Skills

Fire protection design
Data center safety
Project supervision

Tools

FM-200
Novec 1230
VESDA

Job description

Job Description: Fire Protection Engineer
Position Purpose

The Fire Protection Engineer designs and supervises systems that detect and put out fires without destroying sensitive electronic hardware. They ensure the building complies with strict life-safety laws.

Key Responsibilities
  • Specialized Suppression: Oversee the installation of data centre-specific fire systems, including Pre-Action sprinklers and Gas Suppression Systems (e.g., FM-200, Novec 1230, or Inert gas).
  • Early Detection: Supervise the deployment of VESDA (Very Early Smoke Detection Apparatus) and regular smoke detector networks.
  • Bomba Clearance: Manage room integrity testing (door fan tests) for gas rooms and lead inspections to secure the Certificate of Completion and Compliance (CCC) from Jabatan Bomba dan Penyelamat.
  • Life Safety Integration: Ensure fire alarm systems smoothly trigger fire doors, access control overrides, and HVAC shutdowns during emergencies.
Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Fire Protection System Engineer
Fire Protection System Engineer

Jones Lang LaSalle Incorporated • Johor Bahru

On-site
MYR 90,000 - 150,000
Fire Protection System Engineer
Fire Protection System Engineer

JLL • Johor

On-site
MYR 120,000 - 180,000
Mechanical Engineer (Fire Protection – Data Center Projects)
Mechanical Engineer (Fire Protection – Data Center Projects)

MERCU JITU ENGINEERING SDN BHD • Selangor

On-site
MYR 60,000 - 90,000
Mission-Critical Data Center Fire Protection Engineer
Mission-Critical Data Center Fire Protection Engineer

JLL • Johor

On-site
MYR 120,000 - 180,000
Fire Protection Mechanical Engineer for Data Center
Fire Protection Mechanical Engineer for Data Center

MERCU JITU ENGINEERING SDN BHD • Selangor

On-site
MYR 60,000 - 90,000
Fire Protection Mechanical Engineer for Data Center
Fire Protection Mechanical Engineer for Data Center

MERCU JITU ENGINEERING SDN BHD • Selangor

On-site
MYR 60,000 - 90,000
On-Site Data Center Fire Protection Engineer
On-Site Data Center Fire Protection Engineer

Jones Lang LaSalle Incorporated • Johor Bahru

On-site
MYR 90,000 - 150,000
Fire Engineer
Fire Engineer

Hirehub Group • Klang City

On-site
MYR 122,000 - 146,000
Senior Fire Protection Engineer - Data Center Focus
Senior Fire Protection Engineer - Data Center Focus

DayOne Data Centers Ltd. • Malaysia

On-site
MYR 120,000 - 180,000
Senior Fire Protection Engineer – Data Center Projects
Senior Fire Protection Engineer – Data Center Projects

Hirehub Group • Klang City

On-site
MYR 122,000 - 146,000