Electrical Project Managers- Extra Low Voltage (ELV) - Data Centre Construction - PMC - JB

AG STAFFING

Johor Bahru

On-site

MYR 120,000 - 180,000

Full time

4 days ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Job summary

AG STAFFING seeks an Electrical Project Manager for Extra Low Voltage (ELV) in JB/Data Centre construction. You will lead mission-critical system delivery, from security and access control to CCTV networks and BMS/EPMS integration, ensuring seamless coordination with vendors and subcontractors.

This on-site role requires strong BIM capability, experience with structured cabling, and precise software calibration.

Qualifications

  • Experience delivering mission-critical ELV projects in data centres.
  • Knowledge of BIM, CCTV, access control, and fire life safety.
  • Experience with vendor/subcontractor management and variation orders (VOs).

Responsibilities

  • Deliver mission-critical ELV systems delivery and integration.
  • Coordinate life safety and environmental protection installations.
  • Oversee BIM mapping, software calibration, and subcontractor tracking.

Skills

Project management
ELV systems
Security systems
Vendor coordination
Quality control

Tools

BIM
CCTV systems
BMS/EPMS integration

Job description

Electrical Project Managers- Extra Low Voltage (ELV) - Data Centre Construction - PMC - JB

Electrical Project Managers- Extra Low Voltage (ELV) - Data Centre Construction - PMC - JB

Key Responsibilities
1. Mission-Critical System Delivery & Integration
  • Security & Access Control: Oversee the deployment of high-tier physical security infrastructure, including biometric access control systems, physical access control systems (PACS), anti-tailgating mantraps, turnstiles, and perimeter intrusion detection systems (PIDS).
  • CCTV & Video Analytics: Manage the installation of comprehensive high-definition IP-CCTV networks with advanced video analytics for data hall monitoring, fence-line surveillance, and absolute tracking of physical asset movements.
  • BMS & EPMS Integration: Lead the deployment of the Building Management System (BMS) and Environmental/Electrical Power Monitoring System (EPMS) to track temperature, humidity, leakages, and power metrics across the facility.
  • Structured Cabling: Supervise the installation of optical fiber and copper backbone/horizontal cabling systems, including overhead or underfloor cable pathways, splicing, and server room patch frames.
2. Life Safety & Environmental Protection
  • Early Warning Fire Detection: Manage the installation of Very Early Smoke Detection Apparatus (VESDA / Aspirating Smoke Detection) systems to identify structural hazards before open flames erupt.
  • Interlocking Controls: Coordinate complex logical trip matrices between the fire alarm system, gaseous fire suppression systems, mechanical smoke extraction fans, and electrical door release controls.
3. Coordination, Software Calibration & Procurement
  • BIM & Cable Route Control: Utilize Building Information Modeling (BIM) to map dedicated ELV containment paths, avoiding electrical interference (EMI) from high-voltage busducts and cabling.
  • Software Commissioning: Oversee the programming, GUI design, network switch configurations, and software integration of different ELV components into a centralized master control room.
  • Vendor & Subcontractor Tracking: Manage specialized specialized vendors and ELV subcontractors, verifying progress claims and strictly vetting variation orders (VOs).

Job Types: Full-time, Contract

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

ELV Data Centre Project Manager — Critical Systems
ELV Data Centre Project Manager — Critical Systems

AG STAFFING • Johor Bahru

On-site
MYR 120,000 - 180,000
APAC ELV Data Centre Project Lead
APAC ELV Data Centre Project Lead

Burr Computer Environments, INC • Cyberjaya

On-site
MYR 90,000 - 130,000
ELV Project Manager – Data Centre (APAC)
ELV Project Manager – Data Centre (APAC)

Burr Computer Environments, INC • Cyberjaya

On-site
MYR 90,000 - 130,000
ELV Design Manager
ELV Design Manager

Xircle Talent • Johor

On-site
MYR 150,000 - 190,000
ELV Engineer
ELV Engineer

Horizontal Talent • Kuala Lumpur

On-site
ELV Systems Engineer – CCTV, Fire & BMS Design
ELV Systems Engineer – CCTV, Fire & BMS Design

Horizontal Talent • Kuala Lumpur

On-site
Senior ELV Engineer / Team Lead
Senior ELV Engineer / Team Lead

GlobalComm Solutions Sdn Bhd • Penang

On-site
MYR 21,000 - 38,000
ELV Engineer
ELV Engineer

Advance Jupiter Sdn. Bhd. • Kuala Lumpur

On-site
MYR 60,000 - 90,000
ELV Quality Engineer | Banting
ELV Quality Engineer | Banting

Hirehub Management Sdn. Bhd. • Selangor

On-site
MYR 40,000 - 67,000
ELV Quality Engineer
ELV Quality Engineer

Hirehub Group • Selangor

On-site
MYR 40,000 - 67,000