Construction Scheduler: CPM Master & Lookahead Pro

Principle Perspective Engineering

Kuala Lumpur

On-site

MYR 60,000 - 85,000

Full time

14 days+
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Principle Perspective Engineering in Kuala Lumpur, Malaysia is seeking an experienced Construction Scheduler to own the programme from logic to close-out. You will drive progress, serve as the single source of truth for project teams, subs, and clients, and ensure tight control of baselines and look-ahead plans.

Requirements include a Civil/related degree and 3–4 years of hands-on CPM scheduling experience on industrial or heavy construction projects, with strong Primavera P6 proficiency and MS

Qualifications

  • Degree in Civil Engineering, Construction Management, Quantity Surveying, or equivalent.
  • 3–4 years hands-on scheduling experience in industrial, infrastructure, or heavy construction.
  • Experience owning CPM schedules across full project lifecycle (pre-construction through close-out).
  • Proficient in Primavera P6; MS Project as secondary tool.

Responsibilities

  • Develop the construction method statement covering sequencing, phasing, access, logistics, lifting, and CSA/M&E interfaces before the schedule is drafted.
  • Build the CPM baseline schedule in Primavera P6 or MS Project, structured by WBS with all logic ties, milestones, and float management in place.
  • Present and obtain sign-off on the baseline programme before construction mobilises.
  • Manage all changes to the baseline through a proper revision and approval process.
  • Publish 2-week and 4-week look-ahead plans every week, distributed before the weekly planning meeting.
  • Collect actual progress data from Project Engineers, Site Supervisors, and subcontractors at each update cycle.
  • Recalculate float and critical path after every update; flag variances before they compound.
  • Load labour, plant, equipment, and material quantities into the schedule; generate resource histograms.
  • Produce and update S-curves at key milestones for management and client reporting.
  • Maintain an interface register linking the programme to procurement lead times, drawing approvals, authority submissions, and subcontractor programmes.

Skills

CPM scheduling
Project coordination
Analytical thinking
Communication

Education

Bachelor's degree in Civil Engineering or related field

Tools

Primavera P6
MS Project

Job description

Principle Perspective Engineering in Kuala Lumpur, Malaysia is seeking an experienced Construction Scheduler to own the programme from logic to close-out. You will drive progress, serve as the single source of truth for project teams, subs, and clients, and ensure tight control of baselines and look-ahead plans.

Requirements include a Civil/related degree and 3–4 years of hands-on CPM scheduling experience on industrial or heavy construction projects, with strong Primavera P6 proficiency and MS

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Construction Scheduler: Lead CPM Master Plan & Delivery
Construction Scheduler: Lead CPM Master Plan & Delivery

Principle Perspective Engineering Sdn Bhd • Kuala Lumpur

On-site
MYR 100,000 - 167,000
Attractive remuneration and benefit包
Senior Planning Engineer: Master Schedules & Controls
Senior Planning Engineer: Master Schedules & Controls

Bina Schedulers Sdn Bhd • Johor

On-site
MYR 67,000 - 100,000
Construction Scheduler
Construction Scheduler

Principle Perspective Engineering Sdn Bhd • Kuala Lumpur

On-site
MYR 100,000 - 167,000
Attractive remuneration and benefit包
Lead Project Scheduler & Primavera P6 CPM Expert
Lead Project Scheduler & Primavera P6 CPM Expert

Airswift • Johor

On-site
MYR 90,000 - 150,000
Planner / Scheduler
Planner / Scheduler

Principle Perspective Engineering • Kuala Lumpur

On-site
MYR 60,000 - 85,000
Senior Construction Planner: Primavera P6 & MS Project Expert
Senior Construction Planner: Primavera P6 & MS Project Expert

Chin Hin Construction Engineering Sdn Bhd • Selangor

On-site
MYR 60,000 - 100,000
Construction Project Planner - Primavera P6 Expert
Construction Project Planner - Primavera P6 Expert

LanTro (M) Sdn. Bhd. • Kuala Lumpur

On-site
MYR 60,000 - 110,000
Construction Project Scheduler — Primavera P6 & MS Project
Construction Project Scheduler — Primavera P6 & MS Project

Kelington Group Berhad • Johor

On-site
MYR 100,000 - 167,000
Project Scheduler - Primavera P6 Expert
Project Scheduler - Primavera P6 Expert

Exentec • Bayan Lepas

On-site
MYR 78,000 - 112,000
Construction Scheduling Lead | MS Project Expert
Construction Scheduling Lead | MS Project Expert

Creationz Alliance Group • Puchong

On-site
MYR 67,000 - 112,000