Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru

AG STAFFING

Johor Bahru

On-site

MYR 120,000 - 200,000

Full time

14 days+
Application generator

Stand out for this role — generate a tailored resume and cover letter in about a minute.

Get past ATS filters

Job summary

Jora Malaysia is recruiting Architectural Project Managers for data centre construction in Johor Bahru. This role focuses on managing architectural envelopes, structural integration, security zoning, and compliance for high‑density data halls.

You will lead BIM coordination meetings, supervise heavy MEP equipment readiness, and coordinate with suppliers on long‑lead materials while ensuring air tightness, PUE targets, and CCC approvals.

Qualifications

  • Experience leading BIM coordination meetings and resolving spatial clashes.
  • Strong project management skills for multi-discipline coordination in data centre builds.
  • Familiarity with architectural envelope, security, zoning and fire protection concepts.

Responsibilities

  • Oversee architectural envelope, roofing, cladding, raised floors and acoustic ceilings.
  • Coordinate structural loading to support heavy MEP equipment and battery racks.
  • Lead BIM coordination meetings to prevent clashes with mechanical/electrical cabling and ducting.
  • Ensure compliance with local codes and CCC through planning and procurement processes.

Skills

BIM coordination
Project management
Architectural coordination
MEP coordination

Education

Bachelor's degree in Architecture/Engineering

Tools

BIM (Revit)
AutoCAD

Job description

Jora Malaysia will close on 9th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.

Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru

Architectural Project Managers - Data Centre Construction - PMC - Johor Bahru

Key Responsibilities

1. Building Envelope & Structural Fit-Out

  • Aesthetic & Functional Elements: Oversee the execution of external cladding, high-performance roofing systems, sandwich panel walls, raised floor installations, and specialized acoustic ceilings.
  • Structural Loading Coordination: Verify that architectural floor layouts can support ultra-heavy MEP equipment loads, including massive multi-megawatt backup generators, transformers, and high-density battery racks.
  • Spatial Integrity & Air Tightness: Ensure data halls achieve perfect air tightness and thermal insulation properties to minimize cooling leakage and meet strict Power Usage Effectiveness (PUE) requirements.

2. Physical Security, Fire Protection & Zoning

  • Security & Access Control Layouts: Design and implement architectural zoning configurations for physical security, including anti-tailgating turnstiles, mantraps, bullet-resistant partitions, and perimeter fencing.
  • BOMBA Fire Compartmentation: Ensure passive fire protection measures comply with the Uniform Building By-Laws (UBBL), managing fire-rated walls (up to 2 or 4 hours), blast relief dampers, and fire doors.

3. Coordination & Spatial Integration

  • BIM Spatial Control: Lead Building Information Modeling (BIM) coordination meetings to prevent spatial clashes between structural/architectural elements and complex mechanical ducting or electrical cable trays.
  • White Space / Data Hall Readiness: Manage the precise installation of heavy-duty ceiling grids (for structural containment drops), anti-static raised flooring, and hot/cold aisle containment structures.

4. Planning, Procurement & Compliance

  • Material Procurement: Track long-lead architectural materials (e.g., specialized fire-rated doors, certified raised floor tiles, acoustic panels) to prevent critical path delays.
  • Statutory Clearances: Coordinate with local municipal councils (PBT) and relevant bodies to secure the Certificate of Completion and Compliance (CCC).

Job Types: Full-time, Contract

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Project Manager
Project Manager

Angsana Tunas • Shah Alam

On-site
MYR 90,000 - 140,000
Project Manager, Architectural (Data Centre - JB)
Project Manager, Architectural (Data Centre - JB)

Capcon Consulting • Johor Bahru

On-site
MYR 60,000 - 90,000
MEP Project Manager (Data Centre Construction) - PMC - Johor Bahru
MEP Project Manager (Data Centre Construction) - PMC - Johor Bahru

AG STAFFING • Johor Bahru

On-site
MYR 300,000 - 600,000
Construction Project Manager
Construction Project Manager

Aurecon Perunding Sdn Bhd • Selangor

On-site
MYR 180,000 - 240,000
Project Manager, Architectural Data Centre - JB
Project Manager, Architectural Data Centre - JB

Fuku • Johor Bahru

On-site
MYR 120,000 - 180,000
Relocation support
Architecture Specialist
Architecture Specialist

HireHub • Kulai

On-site
MYR 90,000 - 150,000
Electrical Project Managers (Data Centre Construction) - PMC - JB
Electrical Project Managers (Data Centre Construction) - PMC - JB

AG STAFFING • Johor Bahru

On-site
MYR 120,000 - 160,000
Project Manager (Data Center) | Contract
Project Manager (Data Center) | Contract

AirSWIFT • Johor Bahru

On-site
MYR 240,000 - 540,000
Senior Project Manager (Data Center) | Contract
Senior Project Manager (Data Center) | Contract

AirSWIFT • Johor Bahru

On-site
MYR 180,000 - 280,000
On-Site Architectural Design Lead – Data Centre & BIM
On-Site Architectural Design Lead – Data Centre & BIM

Capcon Consulting • Johor Bahru

On-site
MYR 60,000 - 90,000