Jora Malaysia will close on 9th September 2026. Thank you for being with us, we are cheering you on as you continue your career journey.
Electrical Project Managers (Data Centre Construction) - PMC - JB
Electrical Project Managers (Data Centre Construction) - PMC - JB
Key Responsibilities
1. Technical Execution & Engineering Oversight
- System Delivery: Oversee the installation of 132kV/33kV sub-stations, MV/LV switchgear, step-down transformers, UPS systems (2N/N+1), backup diesel generators, busduct tracks, and specialized clean earthing systems.
- Design Review: Evaluate Single-Line Diagrams (SLDs), shop drawings, containment layouts, and engineering calculations to resolve technical clashes before construction begins.
- Cooling Integration: Coordinate power distribution modifications required for high-density IT racks, including transition paths from traditional air cooling to liquid/direct-to-chip cooling architectures.
2. Project Planning & Procurement
- Schedule Management: Develop and manage detailed electrical work packages, tracking milestones via MS Project or Primavera P6 to hit strict Ready-for-Service (RFS) deadlines.
- Long-Lead Tracking: Monitor the manufacturing and delivery of long-lead equipment (e.g., UPS, generators, transformers) to prevent critical path site delays.
- Subcontractor Management: Supervise electrical subcontractors, evaluate progress claims, and manage variation orders (VOs) alongside the commercial team.
3. Regulatory Compliance, Quality & Safety
- Utility Coordination: Liaise directly with Tenaga Nasional Berhad (TNB) and Suruhanjaya Tenaga (ST) for grid interconnection, testing approvals, and energization clearance.
- Statutory Submissions: Work closely with the appointed ST-certified Competent Electrical Engineer to secure legal sign-offs, including Form G and Form H approvals.
- Site Safety: Enforce strict Lock-Out, Tag-Out (LOTO) systems, High Voltage testing permits, and risk assessment strategies (RAMS) in compliance with CIDB and DOSH guidelines.
Job Types: Full-time, Contract