MEP Project Manager – Data Center Construction

PT Joyrun Tech Indonesia

Jakarta Pusat

On-site

IDR 420,000,000 - 600,000,000

Full time

42 hours ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

PT JOYRUN TECH INDONESIA is seeking an MEP Project Manager to lead on-site construction and delivery for data center MEP installations across Jakarta, Bekasi, and Cikarang. The role requires a strong management background and fluency in English or Mandarin to coordinate engineers, subcontractors, and suppliers, ensuring safety and quality.

You will oversee electrical and HVAC systems installation, review technical documents, manage schedules, and drive commissioning activities, while ensuring

Qualifications

  • Degree in Mechanical/Electrical/MEP engineering or related field.
  • Minimum 5 years in MEP installation projects, preferably data centers or large-scale MEP projects.
  • Able to read and interpret MEP drawings, SLDs and equipment layouts.
  • Experience in on-site construction management and schedule control.
  • Familiar with QA/QC, HSE, PTW, and on-site safety procedures.
  • Knowledge of Indonesian construction regulations; SKK Konstruksi or K3 preferred.
  • Fluent in Bahasa Indonesia with good English; Mandarin is a plus.
  • Experience with international data center projects or Chinese GC collaboration preferred.

Responsibilities

  • Take overall responsibility for on-site construction management and project delivery of MEP works.
  • Manage installation of electrical systems: switchgear, transformers, UPS, busducts, cables, grounding.
  • Oversee HVAC installation: chillers, cooling towers, pumps, AHUs, piping.
  • Coordinate equipment delivery, unloading, installation, and site coordination.
  • Develop construction schedules and coordinate engineers, teams, materials, and subcontractors.
  • Review drawings, shop drawings, method statements, and technical docs; resolve issues on-site.
  • Supervise QA/QC, HSE, PTW and site inspections for compliance.
  • Maintain communication with clients, main contractors, design consultants, suppliers, and subcontractors.
  • Coordinate pre-commissioning, CX testing, and commissioning; oversee handover docs.

Skills

Project management
MEP engineering
On-site leadership
Reading drawings
HSE compliance
English/Mandarin

Education

Diploma or Bachelor in MEP

Job description

Job Vacancy: MEP Project Manager - Data Center Construction

Company: PT JOYRUN TECH INDONESIA

Work Location: Jakarta / Bekasi / Cikarang, Indonesia

Target Candidates: Engineering professionals with a management background and strong proficiency in English or Mandarin.

Employment Type: Full-time

Company Description

PT JOYRUN TECH INDONESIA is an engineering services company specializing in Data Center Operations & Maintenance (O&M), MEP installation, commissioning, and testing services. We provide professional engineering solutions to support data center infrastructure, ensuring reliable, efficient, and high-quality project delivery.

As our business continues to grow in Indonesia, we are expanding our local engineering team to support upcoming projects and business operations.

Job Responsibilities

Take overall responsibility for the construction organization, on-site management, and project delivery of data center MEP installation works.

Manage the installation of data center electrical systems, including high- and low-voltage switchgear, transformers, UPS systems, busducts, cable trays, power cables, and grounding systems.

Manage HVAC system installation, including chillers, cooling towers, pumps, precision air conditioning units, chilled water piping, and related mechanical equipment.

Oversee equipment delivery, unloading, lifting, positioning, installation, and on-site construction coordination.

Develop construction schedules and coordinate engineers, construction teams, materials, machinery, and subcontractor resources.

Review construction drawings, Shop Drawings, Method Statements, and related technical documents, and resolve on-site technical issues.

Supervise construction quality, HSE safety management, site inspections, and acceptance procedures to ensure compliance with project specifications and local regulations.

Maintain effective communication and coordination with clients, general contractors, design consultants, equipment suppliers, and subcontractors.

Coordinate pre-commissioning activities, Cx1–Cx5 testing and commissioning, and equipment installation acceptance.

Prepare project progress reports, manage Punch List rectifications, and oversee As-built Drawings and final handover documentation.

Job Requirements

Diploma or Bachelor's degree in Mechanical Engineering, Electrical Engineering, MEP Engineering, or a related field.

Minimum 5 years of experience in MEP installation projects, preferably involving data centers or large-scale industrial MEP projects.

Familiar with installation procedures, construction processes, and quality standards for data center electrical and HVAC systems.

Able to independently read and interpret MEP construction drawings, SingleLineDiagrams (SLD), equipment layout drawings, and related technical documents.

Experienced in on-site construction management, installation schedule control, subcontractor coordination, and team management.

Familiar with QA/QC, HSE, Permit to Work (PTW), and on-site construction safety management procedures.

Knowledge of Indonesian construction regulations and project requirements. Candidates holding SKK Konstruksi or K3-related certifications will be preferred.

Fluent in Bahasa Indonesia with good English communication skills. Mandarin proficiency is an advantage.

Experience working on international data center projects or collaborating with Chinese general contractors is preferred.

Willing to work on project sites and travel within Indonesia when required.

Preferred Qualifications

Experience participating in data center MEP installation projects with a capacity of 10MW or above.

Experience managing large-scale MEP installation subcontractors and construction teams.

Strong knowledge of high- and low-voltage power distribution systems, UPS, busducts, and large-scale HVAC equipment installation.

Experience in data center installation, comissioning, and project handover.

Familiarity with the construction market and local subcontractor networks in Bekasi and Cikarang.

Salary & Benefits

Salary: Negotiable, depending on professional experience and project management capabilities.

Employment Type: Full-time / Project Site-based.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Data Center MEP Project Lead - On‑Site
Data Center MEP Project Lead - On‑Site

PT Joyrun Tech Indonesia • Jakarta Pusat

On-site
IDR 420,000,000 - 600,000,000
MEP Engineer – Data Center Project
MEP Engineer – Data Center Project

ByteBridge • Jakarta Pusat

On-site
IDR 167,400,000 - 279,000,000
MEP Lead/Manager
MEP Lead/Manager

PT Meinhardt Indonesia • Jakarta Pusat

On-site
IDR 900,000,000 - 1,500,000,000
Maintanance MEP Manager
Maintanance MEP Manager

PT Longmotive Indonesia Group • Batam

On-site
IDR 90,000,000 - 150,000,000
Experienced Professional, Mechanical Engineering
Experienced Professional, Mechanical Engineering

WSP Global Inc. • Indonesia

On-site
IDR 240,000,000 - 420,000,000
Commissioning Manager (Data Center)
Commissioning Manager (Data Center)

Confidential • Indonesia

On-site
IDR 800,000,000 - 1,100,000,000
MEP Engineering
MEP Engineering

PT Karyagraha Nusantara • Jakarta Selatan

On-site
IDR 180,000,000 - 300,000,000
CONSTRUCTION MANAGER – ELECTRICAL
CONSTRUCTION MANAGER – ELECTRICAL

PT Pawa Indonesia Engineering • Simpangan

On-site
IDR 600,000,000 - 1,000,000,000
Assistant Project Manager – Data Center | Elitez Group of Companies | Cikarang
Assistant Project Manager – Data Center | Elitez Group of Companies | Cikarang

Elitez Group of Companies • Cikarang

On-site
IDR 167,400,000 - 279,000,000
Project Manager – Data Center | Elitez Group of Companies | Indonesia
Project Manager – Data Center | Elitez Group of Companies | Indonesia

Elitez Group of Companies • Indonesia

On-site
IDR 300,000,000 - 500,000,000