A complete application in a minute
Tailored resume and cover letter, ready to send.
EDF Energy is seeking a Document Author to support the Pre-Operations team for the HPC project in Bridgwater. The role focuses on producing, reviewing and formatting operational documentation across procedures, work instructions and guides, ensuring compliance with standards.
The position is contract-based with three days on site and a lifespan extending to approximately 31 December 2027, contributing to readiness of the future operating organisation for Hinkley Point C.
Role: Document Author
Position: Contract
Days on Site: 3
Duration: Approx until 31 st Dec 2027
Support the Pre-Operations team in the development of the Operational Documentation required for an Operational HPC. The Document Author shall be responsible for assisting in the production of operational documentation, through all stages of the document’s lifecycle.
HPC is one of four EPR Technology Power Stations and has close links to EDF’s Energy’s existing nuclear business. As part of the development of the HPC Strategy it is important that we embedded the lessons learned from the other EPR Technology Power Stations and EDF’s Energy’s existing nuclear business.
The incumbent will be responsible for writing and reviewing specialist operational documentation, including but not limited to procedures, department instruction, work instructions, guides and forms. They are responsible for producing documents that are compliant with company and industry standards, that are user friendly and consistent.
We celebrate and support diversity and are committed to ensuring equal opportunities for both employees and applicants.
INDOT-IP