Get a reply from this employer — a resume and cover letter tailored to exactly what they’re hiring for.
Bechtel is a global leader delivering complex projects across energy, infrastructure and mining sectors. The Cost Engineering/Planning role requires non-routine cost engineering, scheduling, risk assessment, and training delivery for major projects.
You will drive schedule integration, analyze critical paths, and propose alternatives to optimize outcomes. The position demands a bachelor’s degree with 10–13 years (or 14–17 years) of relevant experience, and a proven ability to lead risk
Bechtel is a global leader delivering complex projects across energy, infrastructure and mining sectors. The Cost Engineering/Planning role requires non-routine cost engineering, scheduling, risk assessment, and training delivery for major projects.
You will drive schedule integration, analyze critical paths, and propose alternatives to optimize outcomes. The position demands a bachelor’s degree with 10–13 years (or 14–17 years) of relevant experience, and a proven ability to lead risk