TAR Critical Path Scheduler

Burrow Global, LLC

La Porte (TX)

On-site

USD 120,000 - 170,000

Full time

5 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

Burrow Global, LLC seeks an experienced TAR Critical Path Scheduler to support a large-scale turnaround for a leading petrochemical client. The role spans planning through execution, including long-lead equipment tracking and procurement coordination, with project completion expected in 2028.

The successful candidate will develop, analyze and maintain detailed schedules, optimize critical paths, and collaborate across procurement, engineering and operations to ensure schedule integrity and

Qualifications

  • 8+ years of industrial scheduling experience.
  • Experience as a critical path scheduler on turnaround, shutdown, outage, or large construction projects.
  • Advanced proficiency with Primavera P6, including resource planning, loading, leveling, and critical path analysis.
  • Experience utilizing SAP work orders for planning and scheduling purposes.
  • Strong understanding of construction sequencing and procurement tracking.
  • Experience in petrochemical, refining, chemical, or heavy industrial facilities.
  • Ability to synthesize large amounts of information into executable schedules.
  • Self-motivated professional able to work independently with multidisciplinary teams.

Responsibilities

  • Develop and maintain detailed turnaround schedules using Primavera P6.
  • Perform critical path analysis and schedule optimization.
  • Execute resource planning, loading, and leveling activities.
  • Integrate client-provided SAP work order data into project schedules.
  • Track procurement activities and long-lead equipment deliveries.
  • Develop detailed execution schedules for a 24/7, 13-day turnaround event with shift-level tracking.
  • Collaborate with project managers, planners, procurement, operations, maintenance and contractors.
  • Monitor schedule performance and communicate risks, opportunities, and mitigation plans.

Skills

Primavera P6 proficiency
Critical path analysis
SAP work orders
Resource planning
Resource loading
Resource leveling
Construction sequencing
Industrial scheduling
Independent / self-motivated

Tools

Primavera P6
SAP

Job description

Burrow Global is seeking an experienced TAR Critical Path Scheduler to support a large-scale turnaround project for a leading petrochemical client. This assignment will begin in October 2026 with planning and pre-turnaround activities, leading into the execution phase in April 2027 and continuing through project completion in May 2028.

This role offers the opportunity to become a long-term member of a growing project team. The client has an additional $10MM turnaround project planned for 2029, including extensive long-lead equipment tracking requirements, with future turnarounds anticipated in 2031, 2032, and 2033.

Position Summary

The TAR Scheduler will be responsible for developing, maintaining, and analyzing detailed turnaround schedules while supporting construction execution, procurement tracking, and pre-turnaround planning activities. The successful candidate will serve as the critical path scheduling expert, ensuring schedule integrity and providing actionable insights that drive project success.

Key Responsibilities
  • Develop and maintain detailed turnaround schedules using Primavera P6.
  • Perform critical path analysis and schedule optimization.
  • Execute resource planning, loading, and leveling activities.
  • Integrate client-provided SAP work order data into project schedules.
  • Track procurement activities and long-lead equipment deliveries.
  • Develop detailed execution schedules for a 24/7, 13-day turnaround event, including shift-level performance tracking.
  • Support planning and scheduling efforts for ancillary capital and maintenance projects involving engineering, procurement, and construction activities.
  • Capture and schedule all pre-turnaround activities, including:
    • Pre-fabrication
    • Pre-work execution
    • Long-lead material tracking
    • Construction readiness activities
  • Collaborate with project managers, planners, procurement personnel, operations, maintenance, and contractors to ensure schedule accuracy and alignment.
  • Monitor schedule performance and communicate schedule risks, opportunities, and mitigation plans.
Required Qualifications
  • Minimum 8 years of industrial scheduling experience.
  • Demonstrated experience serving as a critical path scheduler on turnaround, shutdown, outage, or large construction projects.
  • Advanced proficiency with Primavera P6, including:
    • Resource Planning
    • Resource Loading
    • Resource Leveling
    • Critical Path Analysis
  • Experience utilizing SAP work orders for planning and scheduling purposes.
  • Strong understanding of construction sequencing and procurement tracking.
  • Experience supporting petrochemical, refining, chemical, or other heavy industrial facilities.
  • Ability to synthesize large amounts of information into comprehensive, executable schedules.
  • Self-motivated professional capable of working independently while collaborating effectively with multidisciplinary teams.
Turnaround Scope Includes

The turnaround will involve planning and scheduling activities for equipment and work scopes such as:

  • PSV and Control Valves
  • Air Compressors
  • Columns
  • Vessel Cleaning
  • Piping
  • Electrical Systems
  • Rotating Equipment
  • Mechanical and Regulatory Inspections
  • Corrosion Under Insulation (CUI)
  • Water Blasting Operations
Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

TAR Critical Path Scheduler
TAR Critical Path Scheduler

Burrow Global • Town of Texas (WI)

Hybrid
USD 110,000 - 160,000
Petrochemical TAR Critical Path Scheduler - Turnaround Pro
Petrochemical TAR Critical Path Scheduler - Turnaround Pro

Burrow Global, LLC • La Porte (TX)

On-site
USD 120,000 - 170,000
Senior Primavera P6 Critical Path Scheduler (Turnarounds)
Senior Primavera P6 Critical Path Scheduler (Turnarounds)

Burrow Global • Town of Texas (WI)

Hybrid
USD 110,000 - 160,000
TAR P6 Scheduler
TAR P6 Scheduler

Airswift • La Porte (TX)

On-site
USD 85,000 - 120,000
Turnaround Planner
Turnaround Planner

PTS Advance • Krotz Springs (LA)

On-site
USD 101,000 - 166,000
Health
Vision
Dental
+2
Turnaround Scheduler III
Turnaround Scheduler III

Airswift • Hercules (CA)

On-site
USD 80,000 - 100,000
Project Turnaround Planner
Project Turnaround Planner

Teal Energi • Pasadena (TX)

On-site
USD 85,000 - 120,000
Medical insurance
Vision insurance
401(k)
Turnaround Planning and Scheduling Lead
Turnaround Planning and Scheduling Lead

NES Fircroft • Town of Texas (WI)

On-site
USD 120,000 - 160,000
Turnaround Scheduler
Turnaround Scheduler

Industrial Systems Consulting • Hercules (CA)

On-site
USD 100,000 - 120,000
TAR Scheduler (Houston)
TAR Scheduler (Houston)

Houston Dose • Houston (TX)

On-site
USD 96,432 - 110,208