Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Saint Cyr Partners

Houston (TX)

On-site

USD 100,000 - 150,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive salary
Per diem for project travel
Medical, dental, and vision insurance
401(k) with company match
HSA/FSA options
Short-term and long-term disability
Employee discount programs

Job summary

Saint Cyr Partners seeks an experienced Sr. Electrical Estimator for industrial EPC and data center construction in Houston. The role involves developing detailed electrical estimates, reviewing drawings, and coordinating with engineering, procurement, and construction teams on nationwide projects.

Candidates should have strong electrical estimating experience, Excel proficiency, and the ability to travel. Prior data center experience is not required, but a solid construction background is

Qualifications

  • Electrical construction estimating experience in industrial, commercial, EPC, or mission-critical projects.
  • Ability to interpret electrical drawings, specifications, and construction documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Microsoft Excel; familiarity with estimating software (Bluebeam, McCormick, Accubid).

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specs, and bid documents to determine project scope.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams during bidding.
  • Analyze labor productivity and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support estimating improvements.

Skills

Electrical estimating experience
Electrical drawings interpretation
Cost estimating
Subcontractor bid evaluations
Excel
Bluebeam/McCormick/Accubid
Analytical skills
Communication skills
Willingness to travel

Education

Bachelor's degree in Engineering/Construction Management

Tools

Bluebeam
McCormick
Accubid

Job description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Calqulate • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, dental, and vision insurance
401(k) with company matching
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

CareerNerds • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Per diem for travel
Medical/dental/vision insurance
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Genie Matthews and Associates • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Competitive per diem
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Client Growth Resources, Inc • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, vision
401(k) with company match
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Key People • Houston (TX)

On-site
USD 100,000 - 140,000
Comprehensive medical, dental, and VIS
401(k) with matching
Health savings and flexible spending
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Soap Creek Resources • Houston (TX)

On-site
USD 120,000 - 180,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent With Heart • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary based on experience
Per diem for project-related travel
Medical, dental, vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Hire Consulting Services • Houston (TX)

On-site
USD 90,000 - 135,000
Competitive medical, dental & vision
401(k) with matching
Per diem for travel
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Sun Recruiting, Inc. • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, Dental, Vision Insurance
401(k) with matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Meritas Advisory Group, LLC • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, and vis
401(k) with immediate company matching
Per diem for project-related travel
+3