Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Soap Creek Resources

Houston (TX)

On-site

USD 120,000 - 180,000

Full time

10 days ago

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Competitive salary
Per diem for travel
Medical, dental, and vision insurance
401(k) with matching
Health Savings Account
Flexible spending account

Job summary

Soap Creek Resources in Houston, TX seeks a Sr. Electrical Estimator for industrial EPC and data center construction. Fully onsite, 40-45 hours weekly, M-F, with nationwide travel as needed.

The role covers detailed electrical and instrumentation estimates across diverse sectors while collaborating with engineering, procurement, and construction teams. Ideal candidates bring heavy construction estimating experience, ability to interpret complex drawings, and proficiency in Excel and estimating

Qualifications

  • Electrical construction estimating experience in industrial, commercial, EPC, or mission-critical projects.
  • Ability to interpret drawings, specifications, and construction documents.
  • Knowledge of electrical materials, installation methods, and construction labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Excel; familiarity with estimating software such as Bluebeam/Accubid is a plus.

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex projects.
  • Review drawings, specifications, and bid documents to determine project scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Skills

Electrical estimating
Reading drawings
Analytical ability
Communication skills
Organizational skills
Travel flexibility

Education

Bachelor's degree preferred

Tools

Bluebeam
McCormick
Accubid

Job description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Sun Recruiting • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, Dental, Vision Insurance
401(k) with matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Client Growth Resources, Inc • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, vision
401(k) with company match
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

CareerNerds • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Per diem for travel
Medical/dental/vision insurance
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

SourcePro Search, LLC • Houston (TX)

On-site
USD 120,000 - 180,000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent With Heart • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary based on experience
Per diem for project-related travel
Medical, dental, vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Essenti Talent • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary based on experience
Competitive per diem for travel
Medical, dental, and vision insurance
+4
Senior Electrical Estimator - Data Center and Industrial
Senior Electrical Estimator - Data Center and Industrial

Ilocatum • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary
Project travel per diem
Medical, dental, and vision insurance
+5
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Kingfisher Recruiting • Houston (TX)

On-site
USD 120,000 - 180,000
Competitive salary
Per diem for project-related travel
Medical, dental and vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Ashton North LLC • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Acloché LLC • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary
Per diem for travel
Medical, dental, vision insurance
+1