Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent With Heart

Houston (TX)

On-site

USD 110,000 - 150,000

Full time

10 days ago

Get a reply from this recruiter

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Competitive salary based on experience
Per diem for project-related travel
Medical, dental, vision insurance
401(k) with company match
Health savings account / Flexiblespn

Job summary

Talent With Heart in Houston, TX is seeking a Sr. Electrical Estimator to support large-scale industrial EPC and data center construction projects nationwide. This role focuses on developing accurate, competitive estimates for electrical and instrumentation scopes.

You will review drawings, perform takeoffs, evaluate bids, and collaborate with engineering, procurement, and construction teams. Data center experience not required, but strong electrical construction background is essential.

Qualifications

  • Experience estimating electrical work for industrial, commercial, EPC or mission-critical projects.
  • Ability to read electrical drawings, specs, and construction documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Excel; familiarity with Bluebeam, McCormick, or Accubid is preferred.
  • Strong analytical, organizational, and communication skills.
  • Bachelor's degree in Engineering/Construction preferred, not required.
  • Data center construction experience is a plus, not required.
  • Ability to travel nationwide as needed.

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specifications, and bid documents to determine scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout bidding.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Skills

Electrical estimating
Industrial EPC
Data center estimating
Microsoft Excel
Estimating software (Bluebeam)
Estimating software (McCormick)
Estimating software (Accubid)
Interpret drawings & specs
Analytical & organizational skills
Travel nationwide

Education

Engineering/Construction-related degree preferred

Tools

Bluebeam
McCormick
Accubid
Microsoft Excel

Job description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Client Growth Resources, Inc • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, vision
401(k) with company match
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

SourcePro Search, LLC • Houston (TX)

On-site
USD 120,000 - 180,000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Sun Recruiting • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, Dental, Vision Insurance
401(k) with matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Essenti Talent • Houston (TX)

On-site
USD 110,000 - 150,000
Competitive salary based on experience
Competitive per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

CareerNerds • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Per diem for travel
Medical/dental/vision insurance
+1
Senior Electrical Estimator - Data Center and Industrial
Senior Electrical Estimator - Data Center and Industrial

Ilocatum • Houston (TX)

On-site
USD 90,000 - 130,000
Competitive salary
Project travel per diem
Medical, dental, and vision insurance
+5
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent Solutions Partners • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

KingRecruitingServices • Houston (TX)

On-site
USD 85,000 - 130,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Clear Concepts, Inc. • Houston (TX)

On-site
USD 90,000 - 140,000
Competitive per diem for travel
Medical, dental, and vision insurance
401(k) with immediate company matching
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

ExcelliSearch, Inc. • Houston (TX)

On-site
USD 95,000 - 135,000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+3