Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Clear Concepts, Inc.

Houston (TX)

Presencial

USD 90.000 - 140.000

Jornada completa

Hace 10 días

Consigue una respuesta de este empleador

Tu currículum y tu carta de presentación, adaptados exactamente a lo que buscan contratar.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Competitive per diem for travel
Medical, dental, and vision insurance
401(k) with immediate company matching

Descripción de la vacante

Clear Concepts, Inc. is seeking an experienced Sr. Electrical Estimator to support a growing portfolio of large-scale industrial EPC and data center construction projects.

The role is fully onsite in Houston, TX with the flexibility to handle nationwide bidding opportunities and collaboration across engineering, procurement, and construction teams. You will prepare detailed electrical estimates, review drawings, perform quantity takeoffs, evaluate subcontractor bids, and contribute to

Formación

  • Electrical estimating experience within industrial, commercial, EPC, or mission-critical construction.
  • Ability to interpret electrical drawings, specifications, and construction documents.
  • Knowledge of electrical materials, installation methods, and construction labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.
  • Strong analytical, organizational, and communication skills.
  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.
  • Data center construction experience is a plus, not required.
  • Ability to work independently and travel nationwide as needed.

Responsabilidades

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specifications, and bid documents to determine project scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Conocimientos

Electrical estimating
Industrial EPC
Data center construction
Microsoft Excel
Bluebeam
Accubid
Cost analysis
Bid evaluation
Electrical drawings interpretation

Educación

Bachelor's degree in Engineering, Construction Management, or related field

Herramientas

Excel
Bluebeam
McCormick
Accubid

Descripción del empleo

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Connectly Recruiting • Houston (TX)

Presencial
USD 110.000 - 160.000
Medical insurance
Dental insurance
401(k) with company match
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Acloché LLC • Houston (TX)

Presencial
USD 90.000 - 130.000
Competitive salary
Per diem for travel
Medical, dental, vision insurance
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Horan Hiring Solutions, LLC • Houston (TX)

Presencial
USD 110.000 - 170.000
Competitive salary
Project per diem
Medical, dental, vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent Solutions Partners • Houston (TX)

Presencial
USD 110.000 - 160.000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Management Performance Associates • Houston (TX)

Presencial
USD 110.000 - 150.000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

KingRecruitingServices • Houston (TX)

Presencial
USD 85.000 - 130.000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

ExcelliSearch, Inc. • Houston (TX)

Presencial
USD 95.000 - 135.000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Eden Capital Careers • Houston (TX)

Presencial
USD 110.000 - 170.000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Professional Recruiting Consultants, Inc. • Houston (TX)

Presencial
USD 110.000 - 160.000
Medical insurance and dental
Vision
401(k) with company match
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Joseph Michaels International • Houston (TX)

Presencial
USD 110.000 - 150.000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+4