Sr. Electrical Estimator – Industrial EPC & Data Center Construction

SourcePro Search, LLC

Houston (TX)

Vor Ort

USD 120.000 - 180.000

Vollzeit

Vor 10 Tagen

Eine vollständige Bewerbung in einer Minute

Maßgeschneiderter Lebenslauf und Anschreiben – versandbereit.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
Health savings account

Zusammenfassung

SourcePro Search, LLC is seeking a Sr. Electrical Estimator for industrial EPC and data center construction in Houston, TX. This fully onsite role involves preparing detailed electrical estimates, reviewing drawings, and coordinating with engineering, procurement, and construction teams nationwide.

The ideal candidate has strong electrical construction estimating skills, proficiency in Excel, and the ability to travel as needed. Data center experience is a plus but not required.

Qualifikationen

  • Electrical estimating experience in industrial, commercial, EPC, or mission‑critical construction.
  • Ability to interpret electrical drawings, specifications, and construction documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.
  • Strong analytical, organizational, and communication skills.
  • Bachelor's degree in Engineering, Construction Management, or related field preferred, not required.
  • Data center construction experience is a plus, not required.
  • Ability to work independently and travel nationwide as needed.

Aufgaben

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specifications, and bid documents to determine project scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Jobbeschreibung

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Essenti Talent • Houston (TX)

Vor Ort
USD 110.000 - 150.000
Competitive salary based on experience
Competitive per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Client Growth Resources, Inc • Houston (TX)

Vor Ort
USD 100.000 - 150.000
Comprehensive medical, dental, vision
401(k) with company match
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent With Heart • Houston (TX)

Vor Ort
USD 110.000 - 150.000
Competitive salary based on experience
Per diem for project-related travel
Medical, dental, vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Sun Recruiting • Houston (TX)

Vor Ort
USD 110.000 - 160.000
Medical, Dental, Vision Insurance
401(k) with matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

CareerNerds • Houston (TX)

Vor Ort
USD 110.000 - 170.000
Competitive salary
Per diem for travel
Medical/dental/vision insurance
+1
Senior Electrical Estimator - Data Center and Industrial
Senior Electrical Estimator - Data Center and Industrial

Ilocatum • Houston (TX)

Vor Ort
USD 90.000 - 130.000
Competitive salary
Project travel per diem
Medical, dental, and vision insurance
+5
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent Solutions Partners • Houston (TX)

Vor Ort
USD 110.000 - 160.000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Management Performance Associates • Houston (TX)

Vor Ort
USD 110.000 - 150.000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Top Echelon Software LLC • Houston (TX)

Vor Ort
USD 110.000 - 160.000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Ridgemont Resources, Inc. • Houston (TX)

Vor Ort
USD 100.000 - 160.000