Sr. Electrical Estimator – Industrial EPC & Data Center Construction

H.T. Prof Executive Search

Houston (TX)

On-site

USD 90,000 - 140,000

Full time

4 hours ago
Be an early applicant

Get a reply from this recruiter

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

Medical, dental, vision insurance
401(k) with company match
Health savings account
Travel per diem

Job summary

H.T. Prof Executive Search is seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, including data center and industrial sectors.

The role is fully onsite in Houston, TX with nationwide travel and collaboration across engineering, procurement, and construction teams. Ideal candidates bring strong technical construction background, proficiency in Excel and estimating software, and a willingness to work independently on detailed cost

Qualifications

  • Electrical estimating experience in industrial, commercial, EPC or mission-critical projects.
  • Ability to read electrical drawings and specs.
  • Knowledge of electrical materials, installation methods and labor requirements.
  • Experience with quantity takeoffs and subcontractor bids.
  • Proficiency in Excel; familiarity with estimating software.

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex projects.
  • Review drawings, specs and bid documents to determine scope and requirements.
  • Perform quantity takeoffs and cost calculations.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement and construction teams throughout bidding.
  • Analyze labor productivity and material pricing and cost considerations.
  • Participate in pre-bid meetings, site visits and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Skills

Electrical estimating
Cost estimating
Bid evaluation
Drawings interpretation

Education

Bachelor’s degree in Engineering/Construction Management

Tools

Bluebeam
McCormick
Accubid

Job description

Location Houston, TX
No Remote

Type Direct Hire

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities

Prepare detailed electrical and instrumentation estimates for complex construction projects.

Review drawings, specifications, and bid documents to determine project scope and requirements.

Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

Collaborate with engineering, procurement, and construction teams throughout the bidding process.

Analyze labor productivity, material pricing, and project-specific cost considerations.

Participate in pre-bid meetings, site visits, and project walkdowns.

Develop proposal documentation and final bid packages.

Maintain historical cost data and support improvements in estimating accuracy.

Qualifications

Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

Ability to interpret electrical drawings, specifications, and construction documents.

Knowledge of electrical materials, installation methods, and construction labor requirements.

Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

Strong analytical, organizational, and communication skills.

Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

Data center construction experience is a plus, not required.

Ability to work independently and travel nationwide as needed.

Competitive salary based on experience.

Competitive per diem for project-related travel.

Comprehensive medical, dental, and vision insurance.

401(k) with immediate company matching and vesting.

Health savings and flexible spending account options.

Short-term and long-term benefits.

Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Estimator
Senior Estimator

PTS Advance • Houston (TX)

On-site
USD 90,000 - 130,000
Senior Electrical Estimator - Industrial EPC & Data Centers
Senior Electrical Estimator - Industrial EPC & Data Centers

H.T. Prof Executive Search • Houston (TX)

On-site
USD 90,000 - 140,000
Medical, dental, vision insurance
401(k) with company match
Health savings account
+1
Senior Electrical Estimator
Senior Electrical Estimator

Judge Direct Placement • Houston (TX)

On-site
USD 145,000 - 165,000
Relocation assistance
Electrical Estimator
Electrical Estimator

Kansas Electric, Inc • Wichita (KS)

On-site
USD 65,000 - 100,000
Competitive salary
Benefits package
401(k) with company match
+1
E&I Estimator
E&I Estimator

KODIAK Construction Recruiting & Staffing • Odessa (TX)

On-site
USD 104,000 - 114,000
Sr. Estimator (Mechanical/Civil/Structural)- Data Center & Industrial Const
Sr. Estimator (Mechanical/Civil/Structural)- Data Center & Industrial Const

H.T. Prof Executive Search • Houston (TX)

On-site
USD 140,000 - 190,000
Electrical Estimator
Electrical Estimator

NEO International Partners • United States

On-site
USD 80,000 - 120,000
Medical, Dental, and Prescription Drug Insurance
401k retirement and matching
Tuition Reimbursement Program
Senior Electrical Estimator - Utility Construction
Senior Electrical Estimator - Utility Construction

FindTalent • Denver (CO)

On-site
USD 90,000 - 130,000
Competitive compensation package
Paid time off
Comprehensive healthcare plan
+2
Electrical Estimator
Electrical Estimator

StaffSource • Knoxville (TN)

Hybrid
USD 90,000 - 115,000
Relocation assistance
Hybrid work opportunity
Additional company benefits
Senior Electrical Estimator (1155814)
Senior Electrical Estimator (1155814)

The Judge Group • Houston (TX)

On-site
USD 145,000 - 165,000
Medical
Dental
Vision
+2