Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Ashton North LLC

Houston (TX)

Vor Ort

USD 90.000 - 130.000

Vollzeit

Vor 2 Tagen
Sei unter den ersten Bewerbenden

Erhalte eine Antwort von diesem Arbeitgeber

Dein Lebenslauf und dein Anschreiben, genau auf das zugeschnitten, was gesucht wird.

Schaffe es an den ATS-Filtern vorbei

Benefits dieser Stelle

Competitive salary
Per diem for travel
Medical, dental, and vision insurance
401(k) with company matching
HSA/FSAs

Zusammenfassung

Ashton North LLC in Houston, TX is seeking an experienced Sr. Electrical Estimator to support large-scale industrial EPC and data center construction projects.

You will develop detailed electrical and instrumentation estimates, review drawings, and collaborate with engineering, procurement, and construction teams to deliver competitive bids. The role requires strong technical construction background, ability to travel nationwide, and proficiency with Excel and estimating software.

Qualifikationen

  • Electrical estimating experience in industrial, commercial, EPC, or mission-critical construction.
  • Ability to interpret electrical drawings, specs and construction documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

Aufgaben

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specifications, and bid documents to determine project scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Kenntnisse

Electrical estimating
Bid analysis
Excel
Estimating software
Analytical skills

Ausbildung

Bachelor's degree in Engineering or Construction Management

Tools

Bluebeam
McCormick
Accubid

Jobbeschreibung

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Hol dir deinen kostenlosen, vertraulichen Lebenslauf-Check.

oder ziehe deine Datei hierhin.

Similar jobs

Ähnliche Jobs, die dir auch gefallen könnten

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

The Keystone Distinction Group • Houston (TX)

Vor Ort
USD 110.000 - 160.000
Competitive salary
Per diem for travel
Medical, dental, vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

True North Consultants, Inc. • Houston (TX)

Vor Ort
USD 90.000 - 140.000
Per diem
Medical, dental, and vision insurance
401(k) with company matching
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

KLA Industries, Inc. • Houston (TX)

Vor Ort
USD 90.000 - 135.000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Zaddy Solutions • Houston (TX)

Vor Ort
USD 110.000 - 160.000
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

6 Degrees Search • Houston (TX)

Vor Ort
USD 120.000 - 180.000
Comprehensive medical, dental, and/or/
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

MDS Staffing • Houston (TX)

Vor Ort
USD 110.000 - 150.000
Medical, dental, vision insurance
Per diem for travel
401(k) with company match
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Aspire Talent Solutions • Houston (TX)

Vor Ort
USD 90.000 - 130.000
Medical insurance
Dental and vision
401(k) with company match
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Sora Resource Group • Houston (TX)

Vor Ort
USD 120.000 - 180.000
Medical insurance
Dental insurance
Vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Tom Trese Networking LLC • Houston (TX)

Vor Ort
USD 110.000 - 140.000
Competitive salary based on experience
Per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

H.T. Prof Executive Search • Houston (TX)

Vor Ort
USD 90.000 - 140.000
Medical, dental, vision insurance
401(k) with company match
Health savings account
+1