Sr. Electrical Estimator – Industrial EPC & Data Center Construction

ASHFORD CONNEX, LLC

Houston (TX)

Sur place

USD 90 000 - 150 000

Plein temps

Il y a 10 jours

Une candidature complète en une minute

Un CV et une lettre de motivation personnalisés, prêts à envoyer.

Passez les filtres ATS

Avantages offerts par ce poste

Per diem for travel
Medical, dental, and vision insurance
401(k) with matching
HSA/FSA options
Short-term and long-term benefits
Employee discounts

Résumé du poste

ASHFORD CONNEX, LLC, based in Houston, TX, seeks an experienced Sr. Electrical Estimator to support large-scale industrial EPC and data center projects nationwide.

This full-time role onsite involves collaborating with engineering, procurement, and construction teams to deliver accurate, competitive estimates. Candidates should have a strong electrical construction estimating background; data center experience is not required but beneficial.

Qualifications

  • Experience estimating electrical construction projects.
  • Ability to interpret complex drawings, specs, and bid documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs and subcontractor bid evaluations.

Responsabilités

  • Prepare detailed electrical and instrumentation estimates for complex construction projects.
  • Review drawings, specifications, and bid documents to determine scope and requirements.
  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.
  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.
  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.
  • Analyze labor productivity, material pricing, and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and project walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support improvements in estimating accuracy.

Connaissances

Electrical estimating
Industrial EPC
Data center estimating
Cost analysis

Formation

Bachelor's degree preferred

Outils

Excel
Bluebeam
McCormick
Accubid

Description du poste

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Obtenez votre examen gratuit et confidentiel de votre CV.

ou faites glisser et déposez votre fichier ici.

Similar jobs

Postes similaires à comparer

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

The Keystone Distinction Group • Houston (TX)

Sur place
USD 110 000 - 160 000
Competitive salary
Per diem for travel
Medical, dental, vision insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Talent Solutions Partners • Houston (TX)

Sur place
USD 110 000 - 160 000
Medical, dental, vision insurance
401(k) with company match
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Professional Recruiting Consultants, Inc. • Houston (TX)

Sur place
USD 110 000 - 160 000
Medical insurance and dental
Vision
401(k) with company match
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Henderson Group Recruiting • Houston (TX)

Sur place
USD 110 000 - 160 000
Medical Insurance
Dental Insurance
Vision Insurance
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Eden Capital Careers • Houston (TX)

Sur place
USD 110 000 - 170 000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Connectly Recruiting • Houston (TX)

Sur place
USD 110 000 - 160 000
Medical insurance
Dental insurance
401(k) with company match
+2
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Your Talent Team • Houston (TX)

Sur place
USD 120 000 - 160 000
Medical insurance
401(k) matching
Per diem travel
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Clear Concepts, Inc. • Houston (TX)

Sur place
USD 90 000 - 140 000
Competitive per diem for travel
Medical, dental, and vision insurance
401(k) with immediate company matching
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

KingRecruitingServices • Houston (TX)

Sur place
USD 85 000 - 130 000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

ExcelliSearch, Inc. • Houston (TX)

Sur place
USD 95 000 - 135 000
Competitive salary
Per diem for travel
Medical, dental, and vision insurance
+3