Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Pernini Recruiting Company

Houston (TX)

On-site

USD 120,000 - 180,000

Full time

6 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Per diem for travel
Medical, dental, and vision insurance
401(k) with company matching and vest—
Health savings and flexible spending
Long-term benefits
Employee discount programs

Job summary

Pernini Legal, Inc. is seeking a Sr. Electrical Estimator to support large-scale industrial EPC and data center construction projects.

The role is fully onsite in Houston, with travel nationwide as needed and a typical 40–45 hour work week from Monday to Friday. You will prepare detailed electrical estimates, review drawings, perform takeoffs, analyze costs, and collaborate with engineering, procurement, and construction teams to develop competitive bids.

Qualifications

  • Electrical construction estimating experience in industrial, commercial, EPC, or mission-critical projects.
  • Ability to interpret electrical drawings, specs and construction documents.
  • Knowledge of electrical materials, installation methods, and labor requirements.
  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.
  • Proficiency in Excel; familiarity with estimating software (Bluebeam/Accubid) preferred.
  • Strong organizational and communication skills.

Responsibilities

  • Prepare detailed electrical and instrumentation estimates for complex projects.
  • Review drawings and bid documents to define scope and requirements.
  • Perform quantity takeoffs and cost calculations for materials, labor, and equipment.
  • Evaluate supplier and subcontractor quotations for competitiveness.
  • Collaborate with engineering, procurement, and construction teams during bidding.
  • Analyze labor productivity and project-specific cost considerations.
  • Participate in pre-bid meetings, site visits, and walkdowns.
  • Develop proposal documentation and final bid packages.
  • Maintain historical cost data and support estimating improvements.

Skills

Electrical estimating
Drawings interpretation
Microsoft Excel
Estimating software
Communication
Quantity takeoffs
Analytical thinking

Education

Bachelor's degree in Engineering or Construction Management

Tools

Bluebeam
McCormick
Accubid

Job description

Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Location: Houston, TX

Fully onsite. 40-45 hours week M - F.

Position Overview

We are seeking an experienced Electrical Estimator to support a growing portfolio of large-scale construction projects, primarily within the rapidly expanding data center market. Additional projects span the chemical, petrochemical, oil and gas, and other heavy industrial sectors.

This position offers the opportunity to work on complex electrical construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate and competitive estimates.

Prior data center experience is not required. We are interested in electrical estimators with strong technical construction backgrounds who can bring their expertise to this growing sector.

Key Responsibilities
  • Prepare detailed electrical and instrumentation estimates for complex construction projects.

  • Review drawings, specifications, and bid documents to determine project scope and requirements.

  • Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs.

  • Evaluate supplier and subcontractor quotations for accuracy and competitiveness.

  • Collaborate with engineering, procurement, and construction teams throughout the bidding process.

  • Analyze labor productivity, material pricing, and project-specific cost considerations.

  • Participate in pre-bid meetings, site visits, and project walkdowns.

  • Develop proposal documentation and final bid packages.

  • Maintain historical cost data and support improvements in estimating accuracy.

Qualifications
  • Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction.

  • Ability to interpret electrical drawings, specifications, and construction documents.

  • Knowledge of electrical materials, installation methods, and construction labor requirements.

  • Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations.

  • Proficiency in Microsoft Excel; familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred.

  • Strong analytical, organizational, and communication skills.

  • Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required.

  • Data center construction experience is a plus, not required.

  • Ability to work independently and travel nationwide as needed.

Compensation & Benefits
  • Competitive salary based on experience.

  • Competitive per diem for project-related travel.

  • Comprehensive medical, dental, and vision insurance.

  • 401(k) with immediate company matching and vesting.

  • Health savings and flexible spending account options.

  • Short-term and long-term benefits.

  • Employee discount programs.

Why Consider This Opportunity?

Join an established engineering and construction organization expanding its presence in the data center market. Apply your electrical estimating expertise to major infrastructure projects, nationwide project opportunities, and the resources of a well-established organization.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Client Growth Resources, Inc • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, vision
401(k) with company match
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Meritas Advisory Group, LLC • Houston (TX)

On-site
USD 100,000 - 150,000
Comprehensive medical, dental, and vis
401(k) with immediate company matching
Per diem for project-related travel
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Barrette Workforce Solutions, LLC • Houston (TX)

On-site
USD 110,000 - 150,000
Medical Insurance
Dental Insurance
Vision Insurance
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Top Dog Recruiting • Houston (TX)

On-site
USD 100,000 - 140,000
Medical, dental, vision insurance
401(k) with company matching
Health savings account
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Hire Consulting Services • Houston (TX)

On-site
USD 90,000 - 135,000
Competitive medical, dental & vision
401(k) with matching
Per diem for travel
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Confident Search Consultants • Houston (TX)

On-site
USD 85,000 - 130,000
Comprehensive benefits
Per diem for travel
401(k) with company match
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Calqulate Metrics Ltd • Houston (TX)

On-site
USD 110,000 - 160,000
Medical, dental, and vision insurance
401(k) with company matching
Health savings account
+3
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

SourcePro Search, LLC • Houston (TX)

On-site
USD 120,000 - 180,000
Medical, dental, and vision insurance
401(k) with company matching
Per diem for travel
+1
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Genie Matthews and Associates • Houston (TX)

On-site
USD 110,000 - 170,000
Competitive salary
Competitive per diem
Medical, dental, and vision insurance
+4
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Sr. Electrical Estimator – Industrial EPC & Data Center Construction

Vogrinc Search Group • Houston (TX)

On-site
USD 120,000 - 180,000
Competitive salary based on experience
Competitive per diem for project trips
Comprehensive medical, dental, and vis