Senior MEP Estimator: Cost & Change-Order Expert

PMCS Group, Inc.

Los Angeles (CA)

On-site

USD 120,000 - 150,000

Full time

3 days ago
Be an early applicant
Application generator

An application made for this job — a tailored resume and cover letter that speak straight to the posting.

Get past ATS filters

Job summary

PMCS Group, Inc. in the Los Angeles, CA area is seeking an Estimator IV (MEP) to lead cost estimating for mechanical, electrical, and plumbing projects.

The role requires extensive experience with building cost estimates, MEP systems, and multiple contracting forms. Responsibilities include evaluating bids, performing quantity takeoffs, and collaborating with project teams to identify cost-saving opportunities.

Qualifications

  • Ten (10) years minimum of recent professional experience in the preparation of complete cost estimates for type I, II, or III, and V building construction as defined by the State building code including 5 - 7 years of MEP estimating.
  • BS/BA Degree in Engineering, Architecture, Construction Management, or other related degree.
  • Expert in theories, principles, and practices of cost estimating and contract pricing.
  • Expert in Design Build, Design Bid Build and Job Order Contracting forms of contracting.
  • Full knowledge of construction methods for buildings and structures.
  • Full knowledge of current local construction labor and material costs.
  • Full knowledge of MEP systems, construction methods, and industry standards.
  • Extensive experience in developing and estimating the scope of work for change orders.

Responsibilities

  • Plan and participate in the preparation of construction cost estimates of buildings or other structures from drawings, outlines, and specifications.
  • Prepare estimates per design based on scope and building type.
  • Evaluate cost-estimating deliverables prepared by consultants for cost containment, accuracy, uniformity and completeness.
  • Prepare fair cost estimates for cost proposals from Contractors for extra work.
  • Perform special studies and prepare reports when contractors' bids vary from the construction cost estimate.
  • Conduct material takeoffs and quantity surveys for MEP systems.

Skills

Estimating experience
MEP estimating
Cost estimating
Contract pricing
Communication
Negotiation
Mathematical skills

Education

BS/BA in Engineering/Architecture/Construction Management

Tools

RS Means
Accubid
Trimble MEP
Bluebeam Revu

Job description

PMCS Group, Inc. in the Los Angeles, CA area is seeking an Estimator IV (MEP) to lead cost estimating for mechanical, electrical, and plumbing projects.

The role requires extensive experience with building cost estimates, MEP systems, and multiple contracting forms. Responsibilities include evaluating bids, performing quantity takeoffs, and collaborating with project teams to identify cost-saving opportunities.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior MEP Estimator for LA Educational Projects
Senior MEP Estimator for LA Educational Projects

Cmts Llc • Los Angeles (CA)

On-site
USD 180,000 - 190,000
Senior MEP Estimator — Cost & Value Engineer
Senior MEP Estimator — Cost & Value Engineer

Triangle DeCon Services, Inc. • Monterey Park (CA)

On-site
USD 110,000 - 150,000
Senior MEP Cost Estimator — Value & Bids
Senior MEP Cost Estimator — Value & Bids

Element Consulting, Inc. • Los Angeles (CA)

On-site
USD 159,000 - 179,000
Senior MEP Estimator for Complex Projects
Senior MEP Estimator for Complex Projects

Cordoba Corporation • Los Angeles (CA)

On-site
USD 170,000 - 187,000
Senior MEP Estimator – Cost & Value Leader
Senior MEP Estimator – Cost & Value Leader

Element Consulting Inc. • Los Angeles (CA)

On-site
USD 159,000 - 179,000
Senior MEP Estimator: Cost & Value Engineering
Senior MEP Estimator: Cost & Value Engineering

Elementconsulting • Los Angeles (CA)

On-site
USD 159,000 - 179,000
Senior MEP Estimator — Cost, Value Engineering & Bids
Senior MEP Estimator — Cost, Value Engineering & Bids

SummitHR • Los Angeles (CA)

On-site
USD 140,000 - 190,000
Senior MEP Estimator: Cost and Value Engineer
Senior MEP Estimator: Cost and Value Engineer

ENGICON CM • Los Angeles (CA)

On-site
USD 120,000 - 180,000
401(k) matching
Dental insurance
Health insurance
+4
Senior MEP Estimator - Onsite in SoCal
Senior MEP Estimator - Onsite in SoCal

O2EPCM, Inc. dba O2 Engineering, Projects & Construction Management • Los Angeles (CA)

On-site
USD 120,000 - 180,000
Senior MEP Estimator: Cost & Value Engineering
Senior MEP Estimator: Cost & Value Engineering

Vanir Construction Management, Inc. • Los Angeles (CA)

On-site
USD 131,000 - 146,000