Senior Electrical Commissioning Engineer - Data Center Construction

FST Technical Services

Los Angeles (CA)

On-site

USD 130,000 - 180,000

Full time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Job summary

FST Technical Services in Los Angeles is seeking a Senior Electrical Commissioning Project Engineer to lead commissioning activities for critical facilities, from design through on-site validation.

You will coordinate cross-functional teams, manage schedules and budgets, and mentor junior engineers while interfacing with clients and contractors. Regular on-site travel is required, with emphasis on field execution and risk management.

Qualifications

  • Electrical Engineering degree or Qualified Electrician background.
  • 7+ years in electrical systems OR 3+ years commissioning.
  • Data center or mission-critical experience.
  • Ability to read construction drawings and specifications.

Responsibilities

  • Lead commissioning activities across the full project lifecycle.
  • Execute and oversee functional testing, factory witness testing, and on-site validation.
  • Manage multiple assignments while maintaining schedule, budget, and quality expectations.
  • Interpret contract documents to identify risks and opportunities.
  • Lead commissioning meetings and communicate findings; mentor junior engineers.

Skills

Project leadership
Communication
Field problem solving
Reading drawings
Data center experience

Education

Electrical Engineering degree or Qualified Electrician background

Job description

Lead the Systems That Power Critical Infrastructure

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution.

We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments.

Why This Role Stands Out

This is not a checklist-driven commissioning role.

This is a position for someone who:
  • Owns outcomes, not just tasks
  • Understands systems holistically, not in silos
  • Can operate independently while leading others
What You'll Do
Project Leadership & Execution
  • Lead commissioning activities across the full project lifecycle
  • Execute and oversee functional testing, factory witness testing, and on-site validation
  • Manage multiple assignments while maintaining schedule, budget, and quality expectations
  • Interpret contract documents to identify risks and opportunities
Technical Expertise & Problem Solving
  • Evaluate electrical distribution systems and building system interconnectivity
  • Troubleshoot system performance issues in real time
  • Review design documentation and submittals
Client & Stakeholder Engagement
  • Lead commissioning meetings and communicate findings
  • Serve as a trusted partner to clients and contractors
Operational Contributions
  • Complete field reports, documentation, and time management
  • Support scheduling and revenue targets
Team Development
  • Mentor junior engineers and support training initiatives
What You Bring
Core Qualifications
  • Electrical Engineering degree or Qualified Electrician background
  • 7+ years in electrical systems OR 3+ years commissioning
  • Data center or mission-critical experience
Technical Capabilities
  • Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation
  • Ability to read construction drawings and specifications
Professional Skills
  • Strong analytical and communication skills
  • Ability to lead meetings and manage multiple priorities
Physical Requirements
  • Ability to work in field environments, climb ladders, and lift ~30 lbs
Preferred
  • EIT, CEM, LEED, OSHA 30, BIM experience
Travel Requirements

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required.

Why FST

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles

Salary range: $130,000 to $180,000

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Electrical Commissioning Engineer - Data Center
Senior Electrical Commissioning Engineer - Data Center

FST Technical Services, Inc. • Irvine (CA)

On-site
USD 130,000 - 180,000
Senior Electrical Commissioning Engineer
Senior Electrical Commissioning Engineer

FST Technical Services • Detroit (MI)

On-site
USD 130,000 - 170,000
Senior Electrical Commissioning Engineer - Data Center
Senior Electrical Commissioning Engineer - Data Center

FST Technical Services, Inc. • Los Angeles (CA)

On-site
USD 130,000 - 180,000
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center

FST Technical Services, Inc. • United States

On-site
USD 150,000 - 180,000
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center

FST Technical Services, Inc. • Detroit (MI)

On-site
USD 130,000 - 170,000
EIT, CEM, LEED, OSHA 30 (preferred)
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center
Lead Senior Electrical Commissioning (Cx) Engineer - Data Center

FST Technical Services • Detroit (MI)

On-site
USD 150,000 - 180,000
Lead Senior Electrical Commissioning (Cx) Engineer – Data Center
Lead Senior Electrical Commissioning (Cx) Engineer – Data Center

FST Technical Services • Detroit (MI)

On-site
USD 130,000 - 170,000
Lead Commissioning Electrical Engineer
Lead Commissioning Electrical Engineer

FST Technical Services • Los Angeles (CA)

On-site
USD 110,000 - 150,000
Senior Mechanical Commissioning Engineer
Senior Mechanical Commissioning Engineer

FST Technical Services • Detroit (MI)

On-site
USD 130,000 - 150,000
Comprehensive benefits
Monthly per diem
Mobilization support
Senior Electrical Commissioning Engineer - with travel
Senior Electrical Commissioning Engineer - with travel

FST Technical Services • Washington

Hybrid
USD 90,000 - 120,000
Monthly per diem
Mobilization support