Senior Construction Scheduler — Contingency & Risk

KBR

Fort Knox (KY)

On-site

USD 100,000 - 165,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

KBR, Inc. is seeking a Senior Construction Scheduler for the Blue Grass Army Depot Energetics Center of Excellence project in Kentucky.

The role focuses on developing and maintaining complex baseline schedules, performing risk analyses, and delivering schedule insights to support critical decisions. Responsibilities include coordinating with engineering and project teams, ensuring adherence to schedules, and using Primavera P6, MS Project, and Excel to drive progress reporting and scenario

Qualifications

  • Bachelor’s degree in Engineering, Project Management, or related field.
  • 5–10 years’ experience in project scheduling, ideally within major infrastructure or water projects.
  • Strong proficiency in Primavera P6 and MS Project.
  • Understanding of EVM, SPI, schedule risk analysis, and progress measurement.
  • Strong communication skills with the ability to engage effectively with project stakeholders.

Responsibilities

  • Develop and maintain baseline schedules and prepare what‑if scenarios to support project decision‑making.
  • Apply schedule risk management techniques, including contingency planning.
  • Perform critical path analysis, schedule integrity reviews, and progress reporting.
  • Build and manage resource‑loaded schedules, including producing histograms and schedule insights.
  • Work collaboratively with multidisciplinary engineering and project teams to ensure sequencing accuracy and timely program delivery.
  • Utilize tools including Primavera P6, MS Project, and Excel (Power BI experience highly preferred).
  • Support proposal development, capture activities, and long‑range program growth strategies.
  • Other duties as assigned.

Skills

Primavera P6
MS Project
EVM knowledge
Schedule analysis
Stakeholder comms

Education

Bachelor's degree in Engineering

Tools

Excel
Power BI

Job description

KBR, Inc. is seeking a Senior Construction Scheduler for the Blue Grass Army Depot Energetics Center of Excellence project in Kentucky.

The role focuses on developing and maintaining complex baseline schedules, performing risk analyses, and delivering schedule insights to support critical decisions. Responsibilities include coordinating with engineering and project teams, ensuring adherence to schedules, and using Primavera P6, MS Project, and Excel to drive progress reporting and scenario

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Construction Scheduler (Contingency & Risk)
Senior Construction Scheduler (Contingency & Risk)

KBR • Richmond (KY)

Hybrid
USD 95,000 - 150,000
401K plan with company match
Medical insurance
Dental insurance
+7
BGAD: Senior Construction Scheduler ( Contingency )
BGAD: Senior Construction Scheduler ( Contingency )

KBR • Richmond (KY)

On-site
USD 95,000 - 150,000
401K plan with company match
Medical insurance
Dental insurance
+7
Senior Project Controls Lead - Defense Manufacturing
Senior Project Controls Lead - Defense Manufacturing

KBR Technical Services • Fort Knox (KY)

On-site
USD 120,000 - 160,000
401K match
Medical insurance
Dental insurance
+2
Senior Construction Manager, DoD Energetics Plant (On-Site)
Senior Construction Manager, DoD Energetics Plant (On-Site)

KBR • Louisville (KY)

On-site
USD 140,000 - 200,000
Housing allowance
Per diem
Relocation assistance
+1
BGAD: Senior Project Controls Engineer (Contingency )
BGAD: Senior Project Controls Engineer (Contingency )

KBR Technical Services • Fort Knox (KY)

On-site
USD 120,000 - 160,000
401K match
Medical insurance
Dental insurance
+2
Senior Construction Manager — Energetics Plant (DoD)
Senior Construction Manager — Energetics Plant (DoD)

KBR • Louisville (KY)

On-site
USD 180,000 - 240,000
Housing allowance
Per diem allowance
Relocation assistance
+1
BGAD: Construction Engineering Manager - Explosives Manufacturing ( Contingency )
BGAD: Construction Engineering Manager - Explosives Manufacturing ( Contingency )

KBR Technical Services • Fort Knox (KY)

Hybrid
USD 170,000 - 210,000
Relocation assistance
Hybrid work model
Competitive benefits
Lead Construction Engineer — Explosives Manufacturing
Lead Construction Engineer — Explosives Manufacturing

KBR Technical Services • Fort Knox (KY)

Hybrid
USD 170,000 - 210,000
Relocation assistance
Hybrid work model
Competitive benefits
Mission-Critical Data Center Project Scheduler
Mission-Critical Data Center Project Scheduler

Gray • Louisville (KY)

On-site
USD 65,000 - 90,000
Industrial Construction Manager - Scheduling & Oversight
Industrial Construction Manager - Scheduling & Oversight

KBR • Ohio

On-site
USD 120,000 - 170,000
401K with match
Medical insurance
Dental
+7