Senior CAM Lead — Earned Value & Cost Control

RTX

El Segundo (CA)

Hybrid

USD 118,000 - 225,000

Full time

3 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical
Dental
Vision
Life insurance
Short-term disability
Long-term disability
401(k) match
Flexible work schedules
Employee Scholar Program
Parental leave
Paid time off
Holidays
Incentive programs

Job summary

RTX’s Capacity Growth Office (CGO) seeks a seasoned CAM Lead to drive cost, schedule and technical performance for assigned control accounts across multiple programs. You will lead EVMS and EVM reporting, coordinating with engineering, SCM and operations to ensure predictable program outcomes.

The role requires EVMS experience, cost/schedule integration, and a track record with LRE/EAC inputs. Hybrid work is available in Tucson, El Segundo, McKinney and Boston with occasional travel.

Qualifications

  • University degree or equivalent with 8+ years of relevant experience, or an advanced degree with 5+ years.
  • Earned Value Management Certification with experience on contractual EVM.
  • Experience in EVMS, program controls, and cost/schedule integration.
  • Experience preparing LRE / EAC inputs.
  • Experience generating BOEs, BCRs, and other cost/schedule artifacts.
  • Ability to obtain and maintain a U.S. government issued security clearance.

Responsibilities

  • Manage cost, schedule, and technical performance for assigned control accounts.
  • Develop and maintain budgets and schedules to ensure program objectives are met.
  • Monitor performance, analyze variances, and implement corrective actions as needed.
  • Coordinate with cross-functional teams to ensure accurate reporting and compliance with Earned Value Management (EVM) standards.
  • Develop and deliver contractually required EVM reporting and analysis.
  • Execute resource planning and facilitate Estimate-at-Completion (EAC) and Latest Revised.
  • Estimate (LRE) inputs.
  • Assist with risk and opportunity identification, analysis, and mitigation planning.
  • Utilize tools such as Microsoft Excel (including pivot tables and advanced formulas).
  • Microsoft Project, and Achieving Process Excellence (APEX) for detailed analysis and reporting.
  • Travel domestically per demand of the program.

Skills

EVM expertise
EVMS
LRE / EAC inputs
BOEs / BCRs
Excel (Pivot tables)
Microsoft Project
APEX/PMX tools
Cost/schedule integration

Education

University degree or equivalent
Advanced degree in related field
Earned Value Management Certification

Tools

Microsoft Excel
Microsoft Project
APEX
SAP EVMS

Job description

RTX’s Capacity Growth Office (CGO) seeks a seasoned CAM Lead to drive cost, schedule and technical performance for assigned control accounts across multiple programs. You will lead EVMS and EVM reporting, coordinating with engineering, SCM and operations to ensure predictable program outcomes.

The role requires EVMS experience, cost/schedule integration, and a track record with LRE/EAC inputs. Hybrid work is available in Tucson, El Segundo, McKinney and Boston with occasional travel.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Senior Control Account Manager Lead – Earned Value
Senior Control Account Manager Lead – Earned Value

RTX • Tucson (AZ)

Hybrid
USD 118,000 - 225,000
Medical benefits
401(k) match
Flexible work schedules
+1
Lead Control Account Manager — EVMS & Cost/Schedule
Lead Control Account Manager — EVMS & Cost/Schedule

RTX • Dallas (TX)

Hybrid
USD 118,000 - 225,000
Medical, dental, vision
401(k) match
Paid time off & holidays
Control Account Lead — EVMS & Cost/Schedule (Hybrid)
Control Account Lead — EVMS & Cost/Schedule (Hybrid)

RTX • Billerica (MA)

Hybrid
USD 118,000 - 225,000
Medical benefits
401(k) match
Flexible work schedules
+2
EVMS CAM Lead - Hybrid, Secret Clearance
EVMS CAM Lead - Hybrid, Secret Clearance

RTX • McKinney (TX)

Hybrid
USD 118,000 - 225,000
Medical
Dental
Vision
+4
EVMS Control Account Lead - Hybrid - Secret Clearance
EVMS Control Account Lead - Hybrid - Secret Clearance

RTX • Woburn (MA)

Hybrid
USD 118,000 - 225,000
Medical
Dental
Vision
+5
Control Account Lead (EVMS) — Cost & Schedule Expert
Control Account Lead (EVMS) — Cost & Schedule Expert

RTX • Marlborough (MA)

Hybrid
USD 118,000 - 225,000
Medical
Dental
Vision
+11
Hybrid Control Account Manager: EVM & Cost Lead
Hybrid Control Account Manager: EVM & Cost Lead

RTX • El Segundo (CA)

Hybrid
USD 96,000 - 182,000
Medical, dental, vision benefits
401(k) match
Flexible work schedules
Control Account Manager: EVM & Cost Control (Hybrid)
Control Account Manager: EVM & Cost Control (Hybrid)

RTX • Tucson (AZ)

Hybrid
USD 96,000 - 182,000
Medical, dental, vision
401(k) match
Flexible work schedules
EVMS-Centric Cost & Schedule Manager
EVMS-Centric Cost & Schedule Manager

RTX • McKinney (TX)

Hybrid
USD 96,000 - 182,000
Medical insurance
Dental insurance
Vision insurance
+11
Control Account Manager - EVM & Cost/Schedule (Secret)
Control Account Manager - EVM & Cost/Schedule (Secret)

RTX • Billerica (MA)

Hybrid
USD 96,000 - 182,000
Medical
Dental
Vision
+11