School-Based OT: Full-Time, Impactful Pediatric Therapy

AnthroMed Education, LLC

Illinois

On-site

USD 58,000 - 75,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Benefits offered by this job

Medical insurance
Dental insurance
Vision insurance
401(k) with match
Paid parental leave
Short-term disability
Licensure reimbursement
Materials stipend
CEU resources

Job summary

AnthroMed Education, LLC is seeking a full-time Occupational Therapist for the 2026–2027 school year. The role is onsite in Burlington, IL, serving students across PreK–High School with a mixed caseload and final placement determined near start of the year.

You’ll collaborate with teachers, staff, and families, participate in IEP meetings, and develop individualized therapy plans. Illinois OT license required; strong teamwork and documentation skills are essential.

Qualifications

  • Active Illinois Occupational Therapy License (IDFPR) required.
  • Strong collaboration and communication skills.
  • School-based or pediatric experience preferred.

Responsibilities

  • Provide occupational therapy services to students across PreK–High School.
  • Develop individualized therapy plans to support student development.
  • Collaborate with teachers, staff, and families to support student outcomes.
  • Participate in IEP meetings and contribute to goal development.
  • Maintain accurate and compliant documentation.
  • Manage a mixed caseload of resource and some self-contained classrooms.
  • Open to working with all age groups (PreK–High School).
  • Final school assignment determined closer to the start of the school year.

Skills

Collaboration
Communication
Pediatric experience

Job description

AnthroMed Education, LLC is seeking a full-time Occupational Therapist for the 2026–2027 school year. The role is onsite in Burlington, IL, serving students across PreK–High School with a mixed caseload and final placement determined near start of the year.

You’ll collaborate with teachers, staff, and families, participate in IEP meetings, and develop individualized therapy plans. Illinois OT license required; strong teamwork and documentation skills are essential.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

School-Based Occupational Therapist — PreK–12, Full-Time
School-Based Occupational Therapist — PreK–12, Full-Time

AnthroMed Education (School Services) • United States

On-site
USD 58,000 - 75,000
Full medical, dental, and vision insurance
401(k) with 100% employer match
Paid parental leave and short-term disability
+2
Preschool OT Therapist — School-Based, Full-Time
Preschool OT Therapist — School-Based, Full-Time

AnthroMed Education (School Services) • South Holland (IL)

On-site
USD 58,000 - 70,000
Full medical, dental, and vision insurance
401(k) with 100% employer match
Paid parental leave and short-term disability
+5
School-Based Occupational Therapist: Full-Time, Collaborative Team
School-Based Occupational Therapist: Full-Time, Collaborative Team

AnthroMed Education, LLC • Berwyn (IL)

On-site
USD 60,000 - 80,000
Medical insurance
Dental insurance
Vision insurance
+4
School-Based OT: Empower PreK–8th Grade Therapy
School-Based OT: Empower PreK–8th Grade Therapy

AnthroMed • South Holland (IL)

On-site
USD 60,000 - 75,000
Full medical, dental, and vision insurance
401(k) with 100% employer match
Paid parental leave
+3
School-Based OT: K-8, Two Campuses, Make Impact
School-Based OT: K-8, Two Campuses, Make Impact

AnthroMed Education, LLC • Chicago (IL)

On-site
USD 60,000 - 80,000
Weekly pay
Healthcare benefits
401(k) with employer match
+7
School-Based OT - Full-Time with Mentorship
School-Based OT - Full-Time with Mentorship

AnthroMed Education (School Services) • Highland Park (IL)

On-site
USD 60,000 - 80,000
100% employer-paid medical insurance
401(k) match with immediate vesting
Paid time off (PTO)
Occupational Therapist
Occupational Therapist

AnthroMed Education (School Services) • United States

On-site
USD 58,000 - 75,000
Full medical, dental, and vision insurance
401(k) with 100% employer match
Paid parental leave and short-term disability
+2
Occupational Therapist
Occupational Therapist

AnthroMed Education, LLC • Illinois

On-site
USD 58,000 - 75,000
Medical insurance
Dental insurance
Vision insurance
+6
Impactful School-Based OT – Full-Time (IL)
Impactful School-Based OT – Full-Time (IL)

HealthPro Heritage • Arlington Heights (IL)

On-site
USD 65,000 - 87,000
Weekends off
PTO accrual
Benefits package
+1
Full-Time School-Based OT — Impactful Pediatric Therapy
Full-Time School-Based OT — Impactful Pediatric Therapy

AnthroMed Education (School Services) • Michigan

On-site
USD 57,500 - 75,000
Weekly pay
Health insurance
Paid time off
+4