A complete application in a minute — tailored resume and cover letter, ready to send.
Wyman-Gordon is seeking a Saw-Shear (Cutter) Operator - Level 01 to work on the second shift after cross-training on the first shift (5–6am start). The cross-training lasts about 2–6 weeks, after which you will switch to the 2–3pm shift.
The role involves setting up material, operating saws, and logging production data in the ERP system. Required activities include reading job travelers, handling stock with forklift/crane, and performing quality checks.
Wyman-Gordon is seeking a Saw-Shear (Cutter) Operator - Level 01 to work on the second shift after cross-training on the first shift (5–6am start). The cross-training lasts about 2–6 weeks, after which you will switch to the 2–3pm shift.
The role involves setting up material, operating saws, and logging production data in the ERP system. Required activities include reading job travelers, handling stock with forklift/crane, and performing quality checks.