RMS Submittals and Document Control Specialist - Lake City Microgrid and CHP

Energy Resilience Partners, LLC

Independence (MO)

In loco

USD 50.000 - 85.000

Tempo pieno

14 giorni+
Generatore di candidature

Aumenta le possibilità di ricevere una risposta da questo datore di lavoro — un curriculum e una lettera di presentazione personalizzati, che corrispondono esattamente a ciò che sta cercando.

Supera i filtri ATS

Descrizione del lavoro

Energy Resilience Partners, LLC seeks a RMS Submittals and Document Control Specialist for the Lake City Microgrid and CHP project in Independence, MO. On-site work at Lake City Army Ammunition Plant with remote pre-mobilization planning.

This role maintains submittals, RFIs, transmittals, drawings, as-builts, and closeout records in RMS/SEKO and ERP systems, applying version control and restricted handling for CUI where assigned.

Competenze

  • Three years federal construction document control, preferably USACE RMS; careful file naming, registers and permissions management.
  • Strong document accuracy and experience maintaining construction registers.
  • Ability to organize electronic files and follow permission, retention and confidentiality rules.
  • Ability to meet the applicable installation access, safety, information-handling, and assignment requirements.

Mansioni

  • Maintain RMS/SEKO and ERP records for submittals, RFIs, transmittals, meeting minutes, drawings, CQC and closeout.
  • Apply naming, version, review status, retention and distribution controls so crews receive only current approved documents.
  • Track Government review dates and overdue items and reconcile records against the schedule.
  • Support field collection of redlines, test records, training materials and O&M packages by system.
  • Restrict access to CUI/FCI and other controlled material under ERP procedures.

Conoscenze

Attention to detail
Document control
File naming conventions
Permissions management

Strumenti

USACE RMS
SEKO
Bluebeam
Procore

Descrizione del lavoro

RMS Submittals and Document Control Specialist - Lake City Microgrid and CHP

LC-ERP-14 | Lake City Microgrid and CHP | Awarded project recruiting

WORK LOCATION:On site in Independence during assigned field work; pre-mobilization coordination may be remote

REQUISITION:LC-ERP-14

DUTY LOCATION:Lake City Army Ammunition Plant, Independence, Missouri

REPORTS TO:ERP Project Manager / Design and Submittal Manager

EMPLOYMENT:ERP full-time, project-based position

CSS CAM LCAT:8A - Nonexempt Administrative Grade 8 (provisional classification)

PLANNED OPENINGS:1

REQUIREMENT BASIS:Project execution and staffing plan; qualifications verified against assigned work

About ERP and the Project

Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP was awarded the Lake City Army Ammunition Plant Microgrid and Combined Heat and Power construction contract in Independence, Missouri. ERP is recruiting its prime-contractor team to direct and oversee the work.

The project integrates a 15 MW dual-fuel turbine CHP system, HRSGs and steam interfaces, natural-gas and backup propane systems, 12.47 kV distribution and substations, SEL-based protection, microgrid controls, cybersecurity, operator training, and full commissioning at an operating industrial facility. The contract allows 1,014 calendar days after notice to proceed. Recruiting begins now; assignment and site mobilization depend on the required bonds, Government NTP, access, and role-specific onboarding.

Position Summary

Maintain current submittals, RFIs, transmittals, drawings, as-builts, quality and closeout records in RMS/SEKO and ERP systems. Apply version control and restricted handling for CUI where assigned.

What You Will Do
  • Maintain RMS/SEKO and ERP records for submittals, RFIs, transmittals, meeting minutes, drawings, CQC and closeout.
  • Apply naming, version, review status, retention and distribution controls so crews receive only current approved documents.
  • Track Government review dates and overdue items and reconcile records against the schedule.
  • Support field collection of redlines, test records, training materials and O&M packages by system.
  • Restrict access to CUI/FCI and other controlled material under ERP procedures.
Minimum Qualifications
  • Three years federal construction document control, preferably USACE RMS; careful file naming, registers and permissions management.
  • Strong document accuracy and experience maintaining construction registers.
  • Ability to organize electronic files and follow permission, retention and confidentiality rules.
  • Ability to meet the applicable installation access, safety, information-handling, and assignment requirements.
Preferred Qualifications
  • USACE RMS Contractor Mode, SEKO, Bluebeam or Procore.
  • Experience with commissioning turnover and plant as-built records.
  • Relevant military, Tribal, apprenticeship, or nontraditional experience that demonstrates equivalent capability where the role permits it.
What Success Looks Like

Current and complete project registers with no uncontrolled field drawing revisions.

Field, Travel and Employment Conditions
  • Work at an operating industrial installation may involve outdoor weather, uneven ground, stairs or ladders, construction noise, PPE, and coordination around ongoing plant operations. The actual essential functions will be reviewed for the assigned role.
  • Project needs may include scheduled outages, factory testing, startup travel, or occasional weekend and alternate-shift work, subject to employer policies and approved site plans.
  • Final assignment follows approved work packages, qualifications, installation access, and project authorization. Personnel who handle FCI/CUI must use only approved systems and procedures.
  • ERP will provide the approved compensation range, benefits, and any travel terms through its normal hiring process. The internal CSS compensation category is not a promise of a particular rate.
  • ERP welcomes qualified Turtle Mountain Band of Chippewa Indians members, local Missouri candidates, veterans, military spouses, people with disabilities, and applicants from all backgrounds. Hiring decisions follow applicable law and the requirements of the actual employer.
Application Materials
  • Resume with month/year dates, employers, responsibilities, and relevant project types.
  • Current licenses, training, trade qualifications, or certifications needed for the assigned work, with expiration dates if applicable.
  • A concise example of comparable work, availability to work in Independence, and earliest possible start after NTP. References may be requested later.

ENERGY RESILIENCE PARTNERS, LLC | BUILDING ENERGY SOVEREIGNTY AND MISSION RESILIENCE

Ottieni la revisione del curriculum gratis e riservata.

o trascina qui il file.

Similar jobs

Offerte di lavoro simili che vale la pena confrontare

Lake City Project Administrator and Access Coordinator
Lake City Project Administrator and Access Coordinator

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 55.000 - 75.000
Design and Submittal Manager - Lake City Microgrid and CHP
Design and Submittal Manager - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

Ibrido
USD 130.000 - 170.000
Contracts and Change Manager - Lake City Microgrid and CHP
Contracts and Change Manager - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

Ibrido
USD 110.000 - 165.000
Construction Quality Control System Manager - Lake City Microgrid and CHP
Construction Quality Control System Manager - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 120.000 - 180.000
Site Safety and Health Officer - Lake City Microgrid and CHP
Site Safety and Health Officer - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 85.000 - 125.000
Deputy Project Manager and EPC Interface Manager - Lake City Microgrid and CHP
Deputy Project Manager and EPC Interface Manager - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 120.000 - 160.000
Procurement and Expediting Manager - Lake City Microgrid and CHP
Procurement and Expediting Manager - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Independence (MO)

Ibrido
USD 110.000 - 140.000
Lake City Microgrid and CHP Site Superintendent
Lake City Microgrid and CHP Site Superintendent

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 90.000 - 140.000
Lake City ERP CHP Project Manager
Lake City ERP CHP Project Manager

Energy Resilience Partners, LLC • Independence (MO)

In loco
USD 130.000 - 210.000
Project Controls Manager and CPM Scheduler - Lake City Microgrid and CHP
Project Controls Manager and CPM Scheduler - Lake City Microgrid and CHP

Energy Resilience Partners, LLC • Arkansas

Ibrido
USD 110.000 - 160.000