Get a reply from this employer
Your resume and cover letter, tailored to exactly what they’re hiring for.
Energy Resilience Partners, LLC is recruiting a Project Controls Manager and CPM Scheduler for the Lake City Microgrid and CHP project in Independence, MO. The role requires building resource-loaded baselines, recovering schedules, and integrating OEM and Government milestones.
The position is full-time, project-based with hybrid work: regular site presence at Lake City and travel as needed. Candidates should have extensive Primavera P6 experience and strong scheduling analysis skills.
LC-ERP-04 | Lake City Microgrid and CHP | Awarded project recruiting
WORK LOCATION: Hybrid planning possible; regular Independence site presence and travel as project needs require
REQUISITION: LC-ERP-04
DUTY LOCATION: Lake City Army Ammunition Plant, Independence, Missouri
REPORTS TO: ERP Project Manager / Program Controls
EMPLOYMENT: ERP full-time, project-based position
CSS CAM LCAT: 242 - Senior Technical Manager (provisional classification)
PLANNED OPENINGS: 1
REQUIREMENT BASIS: Project execution and staffing plan; qualifications verified against assigned work
Energy Resilience Partners, LLC (ERP) is a tribally led SBA 8(a) federal contractor advancing energy resilience and mission assurance. ERP was awarded the Lake City Army Ammunition Plant Microgrid and Combined Heat and Power construction contract in Independence, Missouri. ERP is recruiting its prime-contractor team to direct and oversee the work.
The project integrates a 15 MW dual-fuel turbine CHP system, HRSGs and steam interfaces, natural-gas and backup propane systems, 12.47 kV distribution and substations, SEL-based protection, microgrid controls, cybersecurity, operator training, and full commissioning at an operating industrial facility. The contract allows 1,014 calendar days after notice to proceed. Recruiting begins now; assignment and site mobilization depend on the required bonds, Government NTP, access, and role-specific onboarding.
Build and maintain the resource-loaded baseline, long-lead and outage logic, three-week lookaheads, critical path and recovery scenarios. Integrate RICHARD and OEM schedules and reconcile actual progress with ERP reporting.
An accepted baseline and documented updates that reveal procurement, permitting, and outage risk early.
ENERGY RESILIENCE PARTNERS, LLC | BUILDING ENERGY SOVEREIGNTY AND MISSION RESILIENCE