Remote Fire Plans Examiner — Flexible Part-Time Impact

Aoka

United States

Remote

USD 55,000 - 69,000

Part time

14 days+

Get a reply from this employer

Your resume and cover letter, tailored to exactly what they’re hiring for.

Get past ATS filters

Benefits offered by this job

$40-$50 per hour, based on experience
Dollar-for-dollar company match up to
Work remotely from Texas

Job summary

Aoka is seeking an experienced fire protection professional to review fire and life safety plans on a project-based, as-needed basis. This remote role serves clients nationwide but currently focuses on Texas jurisdictions, offering flexible hours and meaningful work that protects occupants and first responders.

You will review IFC/IBC and NFPA submittals, coordinate with municipal staff, and deliver precise comments through VertexPlans, contributing to safer buildings and efficient project

Qualifications

  • Active ICC or TCFP Fire Plans Examiner certification required.
  • Minimum of 2 years of experience in fire plan review.
  • Availability to work part-time on an as-needed basis remotely (no guaranteed minimum hours).
  • Strong technical command of the IFC, IBC, and NFPA 13, 14, 72, and 101.
  • Prior experience performing fire plan reviews for municipalities preferred.
  • Working knowledge of Texas fire code adoption and local fire marshal requirements.

Responsibilities

  • Review architectural and fire protection plans for compliance with the IFC, IBC, NFPA standards, and local amendments.
  • Evaluate fire sprinkler, standpipe, and fire pump submittals, including hydraulic calculations (NFPA 13, 13R, 13D, 14, and 20).
  • Review fire alarm and detection system plans, including device layout, notification, and battery calculations (NFPA 72).
  • Verify means of egress, including occupant load, exit capacity, travel distance, and exit signage and lighting.
  • Assess fire-resistance-rated construction, fire barriers, opening protectives, and penetration firestopping.
  • Review fire apparatus access, hydrant placement, fire flow, and special hazards such as hazardous materials, kitchen hood suppression, and smoke control.
  • Prepare clear, accurate review comments and required corrections through the VertexPlans platform.
  • Coordinate with designers, contractors, developers, and municipal staff (including fire marshals and building officials) to resolve review comments.
  • Utilize VertexPlans for project tracking, documentation, communication, and report submission.
  • Consistently meet established turnaround times while maintaining high standards of accuracy and quality.

Skills

Fire plan review experience
IFC/IBC/NFPA knowledge
Remote part-time work
Municipal plan review experience
Texas fire code knowledge

Education

ICC/TCFP Fire Plans Examiner certification

Tools

VertexPlans

Job description

Aoka is seeking an experienced fire protection professional to review fire and life safety plans on a project-based, as-needed basis. This remote role serves clients nationwide but currently focuses on Texas jurisdictions, offering flexible hours and meaningful work that protects occupants and first responders.

You will review IFC/IBC and NFPA submittals, coordinate with municipal staff, and deliver precise comments through VertexPlans, contributing to safer buildings and efficient project

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Remote Fire Plans Examiner — Flexible, Part-Time TX
Remote Fire Plans Examiner — Flexible, Part-Time TX

Aoka • Clifton (TX)

Remote
USD 55,000 - 69,000
Remote work in Texas
5% 401(k) company match
Flexible project-based assignments
Remote Fire Plans Examiner - Part-Time TX
Remote Fire Plans Examiner - Part-Time TX

Aoka • Texas

Remote
USD 55,000 - 69,000
Remote work
Part-time flexibility
Competitive hourly pay
+1
Remote Fire Plans Examiner — Part-Time, TX
Remote Fire Plans Examiner — Part-Time, TX

Aoka • Texas

Remote
USD 55,000 - 69,000
401(k) match up to 5%
Remote Texas role
Part-time, as-needed
Remote Fire Plans Examiner - Part-Time, ICC Certified
Remote Fire Plans Examiner - Part-Time, ICC Certified

Aoka • Austin (TX)

Remote
USD 55,000 - 69,000
Hour pay $40–$50
Company match up to 5%
Remote work in Texas
+2
Remote Fire Plans Examiner – Part-Time (TX)
Remote Fire Plans Examiner – Part-Time (TX)

Aoka • Fort Worth (TX)

Remote
USD 55,000 - 69,000
Remote work from Texas
5% company match
Fire Plans Examiner
Fire Plans Examiner

Aoka • Fort Worth (TX)

Remote
USD 55,000 - 69,000
Remote work from Texas
5% company match
Fire Plans Examiner
Fire Plans Examiner

Aoka • United States

Remote
USD 55,000 - 69,000
$40-$50 per hour, based on experience
Dollar-for-dollar company match up to
Work remotely from Texas
Part Time Examiner
Part Time Examiner

Aoka • Texas

Remote
USD 55,000 - 69,000
Remote work
Part-time flexibility
Competitive hourly pay
+1
Fire Plans Examiner
Fire Plans Examiner

Aoka • Clifton (TX)

Remote
USD 55,000 - 69,000
Remote work in Texas
5% 401(k) company match
Flexible project-based assignments
Fire Plans Examiner
Fire Plans Examiner

Aoka • Texas

Remote
USD 55,000 - 69,000
401(k) match up to 5%
Remote Texas role
Part-time, as-needed