Paint Line Loader II - 3rd Shift, Growth Path

Manpower

Wichita (KS)

On-site

USD 28,000 - 36,000

Full time

19 hours ago
Be an early applicant

Get more replies from employers

Send a job-specific resume in minutes.

Benefits offered by this job

Medical and Prescription Drug Plans
Supplemental Life Insurance
Short Term Disability Insurance
401(k)

Job summary

Manpower is seeking a Paint Line Loader II for a manufacturing plant, operating on the 3rd shift to support painting and assembly processes. The role emphasizes teamwork, accuracy, and adherence to safety standards.

Qualifications include a High School Diploma or GED and at least 2 years of material handling experience. Forklift operation and the ability to lift up to 50 pounds are required, along with basic reading and writing skills for instructions.

Qualifications

  • High School Diploma or GED required.
  • At least 2 years of material handling, logistics, or warehouse experience.
  • Ability to operate a forklift truck legally and safely.
  • Capable of lifting up to 50 pounds and performing overhead work.

Responsibilities

  • Load and manipulate parts manually and mechanically through the painting department to ensure quality results.
  • Assist with paint prep tasks such as debris removal, masking, and cleaning prior to painting in the oven.
  • Move materials, attach/detach parts from conveyors, and ensure proper counts.
  • Perform minor rework on painted parts, including sanding and touch-up to meet quality standards.
  • Operate forklift trucks for material handling with safety and efficiency.

Education

High School Diploma or GED

Tools

Forklift operation

Job description

Manpower is seeking a Paint Line Loader II for a manufacturing plant, operating on the 3rd shift to support painting and assembly processes. The role emphasizes teamwork, accuracy, and adherence to safety standards.

Qualifications include a High School Diploma or GED and at least 2 years of material handling experience. Forklift operation and the ability to lift up to 50 pounds are required, along with basic reading and writing skills for instructions.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Paint Line Loader II
Paint Line Loader II

Manpower • Wichita (KS)

On-site
USD 28,000 - 36,000
Medical and Prescription Drug Plans
Supplemental Life Insurance
Short Term Disability Insurance
+1
Heavy Loader / Unloader – Paint Line (2nd Shift)
Heavy Loader / Unloader – Paint Line (2nd Shift)

IFab Corporation • Gastonia (NC)

On-site
USD 17,000 - 22,000
Heavy Loader / Unloader – Paint Line (2nd Shift)
Heavy Loader / Unloader – Paint Line (2nd Shift)

IFABCORP • Gastonia (NC)

On-site
USD 17,000 - 22,000
2nd Shift: Heavy Loader/Unloader for Paint Line
2nd Shift: Heavy Loader/Unloader for Paint Line

IFABCORP • Gastonia (NC)

On-site
USD 17,000 - 22,000
Paint Line Loader/Unloader - 2nd Shift
Paint Line Loader/Unloader - 2nd Shift

IFab Corporation • Gastonia (NC)

On-site
USD 17,000 - 22,000
Paint Line Helper - 3rd Shift, Fast-Paced Manufacturing
Paint Line Helper - 3rd Shift, Fast-Paced Manufacturing

Rittal LLC • Urbana (OH)

On-site
USD 10,000 - 60,000
Paintline Worker 2nd Shift (3:00pm-11:00pm)
Paintline Worker 2nd Shift (3:00pm-11:00pm)

Havis, Inc. • Warminster Township

On-site
Painter II - 1st Shift
Painter II - 1st Shift

Generac • Town of Berlin (WI)

On-site
USD 22,000 - 30,000
Paint Line Operator - 1st Shift, Growth & Profit-Sharing
Paint Line Operator - 1st Shift, Growth & Profit-Sharing

Hunter-Engineering-Company- • Raymond (MS)

On-site
USD 29,000 - 32,000
Profit-Sharing Plan with Safe Harbor
Generous Paid Time Off & Holidays
Tuition Reimbursement Program
2nd Shift Paint Line Loader/Unloader – Detail-Oriented
2nd Shift Paint Line Loader/Unloader – Detail-Oriented

Spacesaver Corporation • Fort Atkinson (WI)

On-site
USD 28,000 - 37,000