Paint Line Flow Technician — 2nd Shift

Spacesaver Corporation

Fort Atkinson (WI)

On-site

USD 22,000 - 30,000

Full time

2 days ago
Be an early applicant
Application generator

A complete application in a minute — tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Spacesaver Corporation is seeking a Paint Line Loader/Unloader for the 2nd shift to help move components through the paint process. You’ll load, hang, and unload parts, ensuring proper sequence and quality while maintaining clean, safe work practices.

You will work with unpainted and painted parts, package finished products, and follow ERP shop orders. Attention to detail and ability to read a tape measure are essential, with opportunities for overtime as needed.

Qualifications

  • High school diploma or equivalent preferred.
  • Ability to complete basic math and measuring assessments.
  • Comfort using a computer for navigation, scanning, and data entry.
  • Ability to read and understand instructions in English, with translation assistance available upon request.
  • Ability to accurately read a tape measure.
  • Strong attention to detail, time management, and ability to balance multiple priorities.
  • A positive, dependable team member who can also work independently when needed.

Responsibilities

  • Load and unload components from the overhead conveyor to support production schedules and keep work flowing smoothly.
  • Hang and remove parts by size and style, ensuring product sequence and quality standards are maintained.
  • Handle both unpainted and painted parts with care to help ensure a high‑quality finished product.
  • Package finished products according to requirements so they are ready for the next step in the process.
  • Follow safety procedures, including start‑up and shut‑down practices, ergonomic guidelines, and proper material handling.
  • Read and follow electronic and written shop orders to complete work accurately and on time.
  • Perform quality checks and maintain accurate documentation to support consistent production results.
  • Contribute ideas, support continuous improvement efforts, and assist in other work areas when needed.
  • Use Spacesaver’s ERP system for shop order management, scanning, and production reporting.
  • Maintain reliable attendance, work scheduled hours, and be available for overtime as business needs require.

Skills

Attention to detail
Time management
Multitasking
Team player / independent
Computer literacy (scanning & data)
Reads tape measure

Education

High school diploma or equivalent

Tools

Spacesaver ERP system

Job description

Spacesaver Corporation is seeking a Paint Line Loader/Unloader for the 2nd shift to help move components through the paint process. You’ll load, hang, and unload parts, ensuring proper sequence and quality while maintaining clean, safe work practices.

You will work with unpainted and painted parts, package finished products, and follow ERP shop orders. Attention to detail and ability to read a tape measure are essential, with opportunities for overtime as needed.

Get your free, confidential resume review.
or drag and drop your file here.
Similar jobs

Similar jobs worth comparing

Paintline Loader/Unloader 2nd Shift
Paintline Loader/Unloader 2nd Shift

Spacesaver Corporation • Fort Atkinson (WI)

On-site
USD 22,000 - 30,000
Paint Line Loader/Unloader - Detail-Oriented & Fast-Paced
Paint Line Loader/Unloader - Detail-Oriented & Fast-Paced

Spacesaver Corporation • Fort Atkinson (WI)

On-site
USD 2,066,000 - 2,755,000
2nd Shift: Heavy Loader/Unloader for Paint Line
2nd Shift: Heavy Loader/Unloader for Paint Line

IFABCORP • Gastonia (NC)

On-site
USD 17,000 - 22,000
Paintline LoadUnload Storage 1st
Paintline LoadUnload Storage 1st

Spacesaver Corporation • Fort Atkinson (WI)

On-site
USD 2,066,000 - 2,755,000
1st Shift Paint Line Assembler - Storage
1st Shift Paint Line Assembler - Storage

BlueGreen Alliance Inc • Fort Atkinson (WI)

On-site
USD 21,000 - 30,000
Heavy Loader / Unloader – Paint Line (2nd Shift)
Heavy Loader / Unloader – Paint Line (2nd Shift)

IFABCORP • Gastonia (NC)

On-site
USD 17,000 - 22,000
Paint Fill Operator - 2nd Shift, Packaging & Setup
Paint Fill Operator - 2nd Shift, Packaging & Setup

Sherwin-Williams • South Holland (IL)

On-site
USD 45,000 - 60,000
Health benefits
Flexible spending accounts (FSAs)
Retirement plan
+1
Paint Line Loader/Unloader – 2nd Shift, Growth
Paint Line Loader/Unloader – 2nd Shift, Growth

NORCO INDUSTRIES INC • Indiana

On-site
USD 21,000 - 26,000
Competitive pay and benefits package
Opportunities for advancement
Team-oriented environment
+3
Painter I - 2nd Shift
Painter I - 2nd Shift

Generac • Oshkosh (WI)

On-site
USD 34,000 - 39,000
Paint Line Hanger & Packer - 1st/2nd Shift
Paint Line Hanger & Packer - 1st/2nd Shift

Advanced Coatings Inc • Oshkosh (WI)

On-site
USD 19,000 - 25,000
Medical Insurance
Dental Insurance
Vision Insurance
+5