PACU RN – Part-Time, Impactful Patient Care

MemorialCare Health System

Long Beach (CA)

On-site

USD 70,000 - 107,000

Part time

5 days ago
Be an early applicant

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

MemorialCare Health System in Long Beach, CA seeks a Registered Nurse II (RN) for the PACU in Recovery Room Services. This part-time 40-hour weekly role offers day shifts with 8-hour schedules.

The RN delivers safe, cost-effective patient care using the nursing process in PACU/ICU settings. Requirements include CA RN license, BSN, PACU/telemetry experience, and BLS/ACLS/PALS with call responsibilities.

Qualifications

  • A current license to practice as a Registered Nurse in California is required.
  • A Bachelor's degree in Nursing (BSN) required.
  • Graduate from a nationally accredited Registered Nurse Program.
  • Ideal candidate will have nursing experience in PACU/ICU in an inpatient setting or 2 years of Step-Down/Telemetry/ER or 3 years of Med/Surge required.
  • Current BLS, ACLS, PALS & NHISS from AHA required
  • Call required

Responsibilities

  • Provide safe, cost-effective patient care through the nursing process in PACU under established standards.
  • Deliver care within the scope of practice of Registered Nursing for the PACU at Long Beach Medical Center.
  • Collaborate with multidisciplinary teams to ensure smooth patient transitions and optimal recovery.

Skills

PACU experience
ICU experience
Telemetry nursing
BLS certification

Education

Bachelor's degree in Nursing

Tools

EMR systems

Job description

MemorialCare Health System in Long Beach, CA seeks a Registered Nurse II (RN) for the PACU in Recovery Room Services. This part-time 40-hour weekly role offers day shifts with 8-hour schedules.

The RN delivers safe, cost-effective patient care using the nursing process in PACU/ICU settings. Requirements include CA RN license, BSN, PACU/telemetry experience, and BLS/ACLS/PALS with call responsibilities.

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

Registered Nurse (RN) - PACU
Registered Nurse (RN) - PACU

LBMMC-LBMMC Hospital • Long Beach (CA)

On-site
USD 70,000 - 107,000
Evening PACU RN - Part-Time, Meaningful Care
Evening PACU RN - Part-Time, Meaningful Care

Agence PROvidence • Santa Rosa (CA)

On-site
USD 108,000 - 149,000
PACU RN — Advanced Post-Op Recovery & Care
PACU RN — Advanced Post-Op Recovery & Care

Keck Medicine of USC • Los Angeles (CA)

On-site
USD 63,000 - 136,000
PACU RN II – Ambulatory Recovery Specialist
PACU RN II – Ambulatory Recovery Specialist

SCA Health • Arcadia (CA)

On-site
USD 55,000 - 79,000
PACU Registered Nurse Part time Evenings
PACU Registered Nurse Part time Evenings

Lutheran Hospital of Indiana • Fort Wayne (IN)

On-site
USD 30,000 - 42,000
Medical, Dental, & Vision benefits
Sign On Bonus
401K with 50% match up to 6%
+1
PACU RN: Acute Care Recovery Specialist
PACU RN: Acute Care Recovery Specialist

CommonSpirit Health • Redding (CA)

On-site
USD 110,000 - 140,000
PACU RN: Post-Op Recovery Nurse (Day Shift)
PACU RN: Post-Op Recovery Nurse (Day Shift)

Lifepoint Health • Benton (AR)

On-site
USD 60,000 - 86,000
Comprehensive benefits
PTO & life insurance
Tuition assistance
+2
PACU RN: Perioperative Care Pro | Per Diem 12-Hour Shifts
PACU RN: Perioperative Care Pro | Per Diem 12-Hour Shifts

Keck Medicine of USC • Los Angeles (CA)

On-site
USD 96,000 - 206,000
PACU RN (PRN) – Ambulatory Recovery & Care
PACU RN (PRN) – Ambulatory Recovery & Care

Parkland Community Health Plan • Dallas (TX)

On-site
USD 52,000 - 74,000
PACU Registered Nurse Part time Evenings
PACU Registered Nurse Part time Evenings

Community Health Systems • Fort Wayne (IN)

On-site
USD 30,000 - 40,000
Medical, Dental, Vision benefits start
Sign On Bonus
401K with 50% match up to 6%
+1