A complete application in a minute
Tailored resume and cover letter, ready to send.
Buxton Consulting is seeking a senior-level ERP coordination professional for a remote role with periodic travel to Farmingdale for test events, cutover, and go-live. The incumbent will maintain the integrated plan, track open items, and support governance through weekly status, decision logs, and pre-reads for the steering committee.
The role requires coordinating across eight track leads and SMEs, with no direct line management, and delivering concise executive-ready updates.
Our client's Integrated Electronics program runs eight functional tracks through repeated Conference Room Pilot cycles toward a go-live. The tracks are delivering. What has no single owner is the work that sits between them: keeping one plan current, tying open items to dates, tracking interface readiness, preparing the governance gates and publishing one honest status every week.
This role takes that work. It is a coordination role with no authority over delivery. The people doing functional and technical work keep doing it exactly as they do now, and every decision they make today stays with them.
Reports to Senior Information Technology Director, Business Systems
Works alongside Business lead, business analyst directors, development lead, database lead and the eight track leads
Maintains one schedule with dependencies, durations and named owners. Republishes weekly with float against the go-live date.
Keeps a fix version and a due date on every open JIRA item. Chases unassigned items to an owner.
Maintains one readiness status per interface, updated weekly, covering the Oracle and non-Oracle applications.
One page every week: milestone dates, float, top risks, decisions needed and exceptions carried.
Prepares the agenda, the decision list and the pre-read. Records outcomes.
Tracks every open decision with a requester, a decider and a required by date. Escalates at ten working days.
Assembles the evidence against written criteria for both checkpoints.
Owns the document and coordinates the rehearsal.
Publishes the trend and coordinates daily triage during test events.
Keeps it current and escalates anything scoring above the agreed threshold.
Stated explicitly so the role can be introduced without disrupting a team that is already delivering.
Track leads and subject matter experts
Development lead and the database team
Track leads and the test owner
Steering committee. The coordinator prepares the assessment.
Nobody reports to this role
One view of everything open, drawn from JIRA and the event report outs, with an owner and a target date against each item.
The plan walked with every track lead, with durations, dependencies and owners agreed track by track.
Plan baselined. First weekly status published. Decision log running.
Integrations readiness register live, with a named owner and target date per interface.
Cutover runbook drafted, including interface restart steps and rollback points.
Both go or no-go gates prepared against written criteria.