Onsite QA/QC Manager — Data Center Construction

Giga Energy Inc.

Houston (TX)

Presencial

USD 110.000 - 170.000

Jornada completa

14 días+
Generador de candidaturas

Una candidatura hecha a medida para este puesto de trabajo — un currículum y una carta de presentación adaptados que responden directamente a la oferta.

Supera los filtros ATS

Ventajas ofrecidas por este puesto de trabajo

Health insurance
Equity options
401(k) with match
Unlimited PTO
Parental leave
FSA or HSA
Commuter benefits
Team on-sites

Descripción de la vacante

Giga Energy Inc. is seeking an onsite QA/QC Manager to own the quality program for data center construction from foundation to turnover. You will lead ITPs, manage NCRs, coordinate third-party inspections, and drive accountability with subcontractors on active sites.

Based on a Houston-area project portfolio, this role requires travel/relocation and hands-on field verification to ensure compliance with drawings, specs, and codes. Strong documentation and communication skills are essential.

Formación

  • 5+ years of QA/QC on commercial/industrial/construction projects.
  • Experience developing ITPs and managing NCR/deficiency tracking on active sites.
  • Strong knowledge of drawings, specs, and codes (IBC/NEC/ASHRAE).
  • Experience coordinating third-party/special inspections with AHJ requirements.
  • Ability to maintain quality documentation for turnover.
  • Detail-oriented with ability to communicate deficiencies clearly.

Responsabilidades

  • Develop, implement, and manage site QA/QC program for data center construction.
  • Create and execute ITPs across trades.
  • Conduct field inspections to verify compliance with drawings, specs, and codes.
  • Review and approve subcontractor quality plans and submittals.
  • Manage NCR process, track corrective actions, verify resolutions.
  • Coordinate third-party inspections and testing.
  • Maintain QA/QC documentation and as-built markups.
  • Participate in design reviews to identify constructability issues.
  • Support commissioning and turnover with complete documentation.
  • Report QA/QC metrics to Project Director.

Conocimientos

QA/QC experience
ITP development
NCR management
Construction drawings/specs
Code knowledge
Documentation
Communication
Procore

Herramientas

Procore

Descripción del empleo

Giga Energy Inc. is seeking an onsite QA/QC Manager to own the quality program for data center construction from foundation to turnover. You will lead ITPs, manage NCRs, coordinate third-party inspections, and drive accountability with subcontractors on active sites.

Based on a Houston-area project portfolio, this role requires travel/relocation and hands-on field verification to ensure compliance with drawings, specs, and codes. Strong documentation and communication skills are essential.

Consigue la evaluación confidencial y gratuita de tu currículum.

o arrastra y suelta tu archivo aquí

Similar jobs

Puestos de trabajo similares que vale la pena comparar

Onsite QA/QC Manager — Data Center Quality Champion
Onsite QA/QC Manager — Data Center Quality Champion

Hub71 Ltd • Houston (TX)

Presencial
USD 85.000 - 130.000
Subsidized health, dental, and vision
Equity options
401(k) with 4% employer match
+5
Onsite QA/QC Lead — Mission-Critical Data Center
Onsite QA/QC Lead — Mission-Critical Data Center

Daksta • EE. UU.

Presencial
USD 90.000 - 130.000
QA/QC Manager
QA/QC Manager

Thor • Town of Texas (WI)

Presencial
USD 90.000 - 130.000
Data Center Construction Manager — Remote + Travel
Data Center Construction Manager — Remote + Travel

Giga Energy Inc. • Houston (TX), San Francisco (CA)

Híbrido
USD 95.000 - 155.000
Data Center QA/QC Leader — Quality & Onsite Excellence
Data Center QA/QC Leader — Quality & Onsite Excellence

IES Mission Critical • Pecos (TX)

Presencial
USD 90.000 - 130.000
On-Site Data Center QA Manager – Construction Lead
On-Site Data Center QA Manager – Construction Lead

Decima International • Amarillo (TX)

Presencial
USD 100.000 - 150.000
Life and health insurance
Dental and vision coverage
Annual bonus
Traveling QA/QC Manager — Data Center Projects
Traveling QA/QC Manager — Data Center Projects

Turner Construction Company • Memphis (TN)

Presencial
USD 95.000 - 135.000
QA/QC Manager
QA/QC Manager

Kizer Energy Inc. • Hubbard (TX)

Presencial
USD 120.000 - 180.000
Data Center QA/QC Manager – Onsite Electrical Quality
Data Center QA/QC Manager – Onsite Electrical Quality

Ies Co • Pecos (TX)

Híbrido
USD 75.000 - 120.000
401(k) plan
Health insurance
Disability insurance
+3
Quality Manager
Quality Manager

Hub71 Ltd • Houston (TX)

Presencial
USD 85.000 - 130.000
Subsidized health, dental, and vision
Equity options
401(k) with 4% employer match
+5