On-Site Materials Manager - Data Center Construction

Hut 8 Corp.

San Antonio (TX)

On-site

USD 65,000 - 95,000

Full time

14 days+

A complete application in a minute

Tailored resume and cover letter, ready to send.

Get past ATS filters

Job summary

Hut 8 Corp. in San Antonio, TX, seeks a Materials Manager to own on-site material receiving, laydown, storage, and inventory control for a data center build.

You will prevent field delays by ensuring material availability aligns with the installation schedule. In this boots-on-the-ground role, you’ll coordinate with field superintendents, planners, and vendors, manage laydown yards, run cycle counts, and enforce OEM preservation requirements for major equipment, while maintaining accurate

Qualifications

  • 5+ years in site materials management, warehousing, or field logistics on industrial, power, or data center construction projects.
  • Direct experience receiving and storing major electrical/mechanical equipment, including OEM preservation requirements.
  • Strong inventory-control discipline: location systems, cycle counts, and reconciliation habits that hold up under audit.
  • Fluency with inventory/ERP tools and Excel; barcode/scanning system experience a plus.

Responsibilities

  • Run the site receiving operation: delivery scheduling and gate coordination, unloading and inspection, OS&D documentation with photos, and same-day receiving records against POs.
  • Manage laydown yards, warehouse space, and climate-controlled storage with a documented location system.
  • Maintain accurate inventory records tied to storage locations; run cycle counts; reconcile physical inventory against POs, BOMs, and issue records; and report shortages against upcoming installation needs before they become field delays.
  • Run a disciplined material issue process to trade partners - requisitions, staging, sign-out accountability - and manage returns, surplus, and attrition tracking.
  • Work the three-week lookahead with superintendents and the planner: verify material readiness for upcoming work fronts, flag at-risk items, and stage material to work areas ahead of need.
  • Coordinate crane and forklift resources for material moves, keep laydown areas safe and organized, and support site logistics planning as the project density increases.

Skills

Inventory control
ERP tools
Excel
Site logistics
Forklift certified
OSHA awareness
Coordination

Job description

Hut 8 Corp. in San Antonio, TX, seeks a Materials Manager to own on-site material receiving, laydown, storage, and inventory control for a data center build.

You will prevent field delays by ensuring material availability aligns with the installation schedule. In this boots-on-the-ground role, you’ll coordinate with field superintendents, planners, and vendors, manage laydown yards, run cycle counts, and enforce OEM preservation requirements for major equipment, while maintaining accurate

Get your free, confidential resume review.

or drag and drop your file here.

Similar jobs

Similar jobs worth comparing

On-Site Materials Manager, Data Center Construction
On-Site Materials Manager, Data Center Construction

Hut 8 Corp. • Austin (TX)

On-site
USD 65,000 - 98,000
On-Site Materials Manager for Data Center Build
On-Site Materials Manager for Data Center Build

Hut 8 Corp. • Houston (TX)

On-site
USD 70,000 - 100,000
On-Site Materials Lead for Data Center Build
On-Site Materials Lead for Data Center Build

Hut 8 Corp. • Corpus Christi (TX)

On-site
USD 70,000 - 110,000
Materials Manager
Materials Manager

Hut 8 Corp. • Austin (TX)

On-site
USD 65,000 - 98,000
Materials Manager
Materials Manager

Hut 8 Corp. • Corpus Christi (TX)

On-site
USD 70,000 - 110,000
Materials Manager
Materials Manager

Hut 8 Corp. • Houston (TX)

On-site
USD 70,000 - 100,000
Materials Manager
Materials Manager

Hut 8 Corp. • San Antonio (TX)

On-site
USD 65,000 - 95,000
Modular Data Center Materials Lead
Modular Data Center Materials Lead

Advanced Giga Inc • McAllen (TX)

On-site
USD 75,000 - 110,000
Insurance
401K match
Onsite Materials & Logistics Lead
Onsite Materials & Logistics Lead

Nexus Data Centers • Hubbard (TX)

On-site
USD 60,000 - 90,000
Site Materials & Logistics Lead for Heavy Equipment
Site Materials & Logistics Lead for Heavy Equipment

LAMP • Liberty (TX)

On-site
USD 90,000 - 130,000